My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2300 - Underground Storage Tank Program
>
PR0231094
>
COMPLIANCE INFO_2008-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2023 1:39:29 PM
Creation date
6/23/2020 6:42:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2009
RECORD_ID
PR0231094
PE
2361
FACILITY_ID
FA0003632
FACILITY_NAME
AJS MINI MART INC
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95207
APN
07935016
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231094_7906 N EL DORADO_2008-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
421
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OCT -27-2008 02:59 PM GETTLER—RYAN INC. 925 551 4770 P.04 <br />I Ngnitoring System Certification 0 <br />F. In -Tank Gauging/ SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control. <br />0 Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment iS USC(l to perform leak detection monitoring. <br />Complete the following checklist! <br />.. in tur aurtion n, neiow, oescrioe now and when these deticlencles were or Hill be corrected. <br />G. Line Leak Detectors (LLD).- ❑ Check this box if L.LDs are riot installed. <br />Irnninlato the Mlinwina d-hapkilet- <br />0 Yes <br />0 No* <br />For equipment start-up or annual equipment certification. was a leak simulated to verify LLD performance? <br />❑ N/A <br />(Check all that app4w Simulated leak rate, ❑ 3 g,p.li.: ❑ 0.1 g.p.h , ❑ 0.2 g.p.h, <br />❑ Yes <br />CJ No* <br />were all LLI)s confirmed operational and accurate within regulatory requirements'? <br />O Yes <br />Cl No* <br />Was the testing apparaOss properly calibrated'.) <br />❑ Yes <br />❑ No* <br />For mechanical LLDs, does the I.I.T) restrict product flow if it detects a leak'! <br />0 N/A <br />❑ Yes <br />❑ No* <br />For electronic L.1 -13s, does the turbine automatically shut oil' if the LID detects a leak'? <br />[2 N/A <br />Yes <br />❑ NO <br />For electronic I-LDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />❑ N/A <br />or disconnected? <br />Yes <br />❑ No* <br />For electronic LI.Ds, doet, the tus•bine allEOITIAUC011y shut Offil'any portion of the monitoring; system malfunctions <br />❑ N/A <br />or fails a test? <br />❑ Yes <br />❑ No* <br />For electronic LIM, have all accessible wiring coruiections been visually inspected? <br />0 MA <br />❑ Yes <br />0 No* <br />Were all items on the equipment manufacturer',,; maintenance checklist completed? <br />In the <br />Section H. <br />below. describe how and when these deficiencies were nr will be corrected. <br />H. Comments-, <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.