Laserfiche WebLink
D. Results of Testing/Servicing <br />Software Version Installed: &Y <br />. es <br />❑ No* <br />Is the audible alarm operational? <br />des <br />❑ No* <br />Is the visual alarm operational? <br />®des <br />❑ No* <br />Were all sensors visually inspected, functionally tested, and confirmed o erational? <br />Q -''Yes <br />❑ No* <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br />not interfere with their pmper operation? <br />2 Yes <br />❑ No* . <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br />❑ NIA <br />operational? <br />M -Yes <br />❑ No* <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br />❑ NIA <br />monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br />positive shutdown? (Check all that apply) D'Sump(Prench Sensors; U-Bispenser Containment Sensors. <br />Did you confirm positive shut -down due to leaks and sensor failure/disconnection? Q -Yes; ❑ No. <br />EPY�es <br />❑ No* <br />For tank systems that utilize, the monitoring system. as the primary tank overfill warning device (i.e. no <br />❑ NIA <br />mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br />fillpoint(s) and operating o eri ? If so; at what percent of tank capacity does the alarm triger? % <br />❑ Yes* <br />U --Igo <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced <br />and list the manufacturer name and model for all replacement parts in Section E, below. <br />❑ Yes* <br />ELM <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) ❑ <br />Product; ❑ Water. If yes, describe causes in Section E, below. ., <br />Q—Yes <br />❑ No* <br />Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br />es <br />❑ No* <br />Is all monitoring ui mentoperational per manufacturer's specifications? <br />* In Section E below, describe how and when these uenctenctes were or win ne correcrea. <br />"D lt7,111 <br />Page 2 of 3 <br />e <br />