Laserfiche WebLink
SWRCB, January 2006 <br />Spill Bucket Testing Report Form <br />This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br />printouts from tests (f applicable), should be provided to the facility ownerloperator for submittal to the local regulatory agency. <br />i <br />1. FACILITY INFORMATION <br />Facility Name: r G Date of Testing: <br />Facility Address: <br />Facility Contact: Phone: <br />Date Local. Agency Was Notified of Testing: <br />Name of Local Agency Inspector (ifpresent during testing): <br />Company Name: u, .,.. I-//" . <br />Technician Conducting Test:'1321,E �k <br />Credentials': 0 CSLB Contractor OICC Service Tech. 0 SWRCB Tank Tester 0 Other (Spee) <br />License Number(s): <br />3. SPML BUCKET TESTING INFORMATION <br />Test Method Used: OHydrostatic 0 Vacuum 0 Other <br />Test Equipment Used: Equipment Resolution: <br />Identify Spill Bucket (By Tank <br />Number, Stored Product, etc) <br />1 <br />2 <br />3 4 <br />Bucket Installation Type: <br />0 Direct Bury <br />Contained in Sum <br />0 Direct Bury <br />0 -Contained in Sum <br />0 Direct Bury 0 Direct Bury <br />&C--ontained in Sum e-eontained in Sum <br />Bucket Diameter: <br />Bucket Depth: <br />Wait time between <br />e <br />acuum/watr and tart applying est: <br />> <br />�° <br />Test Start Time (Ti): <br />7,.. <br />Initial Reading A): <br />Test End Time (TF): <br />Final Reading (RF): <br />Test Duration (TF — T): <br />/ !r; — <br />Change in Reading (Rx - RI): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />"ass ❑Fail <br />0- Pass 0 Fail <br />[Pass ❑Fail 13 Pass ❑Fail <br />Comments — rnclude information on repairs made prior to testing and recommended follow-up forfailed tests) <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING j <br />I hereby certo that all the information contained u: this report is true, accurate, and In full compliance wUh legal requirements. 1. <br />J <br />t <br />Technician's Signature: Date: <br />' State laws and regulations do not currently require testing to be performed by a qualified contractor. However, Iocal requirements <br />may be more stringent. <br />