My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
2300 - Underground Storage Tank Program
>
PR0231125
>
COMPLIANCE INFO_1996-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 11:40:15 AM
Creation date
6/23/2020 6:43:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2004
RECORD_ID
PR0231125
PE
2361
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
01
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231125_1210 E HAMMER_1996-2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�C <br /> Page of <br /> 4. TANK ANNULAR TESTING <br /> Test Method Developed By: X Tank Manufacturer Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Uses: ❑Pressure X Vacuum ❑Hydrostatic <br /> ❑Other(Sped) <br /> Measuring Equipment Used for Testing:Liquid Filled Vac Gauges <br /> Om <br /> Tank#1 RU Tank#2 PLUS Tank#3 SU <br /> Tank Capacity: 12041 10118 10118 <br /> Tank Material: Fibersteel Fibersteel Fibersteel <br /> Tank Manufacturer: Trusco Trusco Trusco <br /> Product Stored: RU PLUS SU <br /> Wait time between applying <br /> pressure/vacuum/water and starting IOMIN IOMIN IOMIN <br /> test: <br /> Test Start Time: 0835 0840 0842 <br /> Initial Reading(Rj): -10"HG -10"HG -10"HG <br /> Test End Time: 0935 0940 0942 <br /> Final Reading(RF): -10"HG -10.5"HG -10"HG <br /> Test Duration: IHR IHR IHR <br /> Change in Reading(RF-RI): 0 +0.5 0 <br /> Pass/Fail Threshold: 2" 2" 2" <br /> Test Result: PASS PASS PASS <br /> Was sensor removed for testing? YES YES YES <br /> Was sensor properly replaced after YES YES YES <br /> testing? <br /> Comments— <br /> SWRCB December 2001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.