My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
2300 - Underground Storage Tank Program
>
PR0231125
>
COMPLIANCE INFO_1996-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 11:40:15 AM
Creation date
6/23/2020 6:43:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2004
RECORD_ID
PR0231125
PE
2361
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
01
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231125_1210 E HAMMER_1996-2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Uses: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Sped) <br /> Measuring Equipment Used for Testing: Liquid Filled Pressure Gauges <br /> Piping Run#1RU Piping Run#2 PLUS Piping Run#3 SU <br /> Piping Material: FIBERGLASS FIBERGLASS FIBERGLASS <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 3" 3" 3" <br /> Length of Piping Run: 175' 175' 200' <br /> Product Stored: RU PLUS SU <br /> Method and location of 3X2 BOOTS 3X2 BOOTS 3X2 BOOTS <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and IOMIN IOMIN IOMIN <br /> starting test: <br /> Test Start Time: 0740 0745 0905 <br /> Initial Reading(RI): 5.0 PSI 5.0 PSI 5.0 PSI <br /> Test End Time: 0810 0815 0935 <br /> Final Reading(RF): 5.0 PSI 5.0 PSI 5.0 PSI <br /> Test Duration: 30MIN 30MIN 30MIN <br /> Change in Reading(RF-RI): 0 0 0 <br /> Pass/Fail Threshold: -.2 PSI -.2 PSI -.2 PSI <br /> Test Result: PASS PASS PASS <br /> Comments— (include information on repairs made prior to testing) <br /> SWRCB December 2001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.