Laserfiche WebLink
0 <br /> Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Uses: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Sped) <br /> Measuring Equipment Used for Testing: Liquid Filled Pressure Gauges <br /> Piping Run#1RU Piping Run#2 PLUS Piping Run#3 SU <br /> Piping Material: FIBERGLASS FIBERGLASS FIBERGLASS <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 3" 3" 3" <br /> Length of Piping Run: 175' 175' 200' <br /> Product Stored: RU PLUS SU <br /> Method and location of 3X2 BOOTS 3X2 BOOTS 3X2 BOOTS <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and IOMIN IOMIN IOMIN <br /> starting test: <br /> Test Start Time: 0740 0745 0905 <br /> Initial Reading(RI): 5.0 PSI 5.0 PSI 5.0 PSI <br /> Test End Time: 0810 0815 0935 <br /> Final Reading(RF): 5.0 PSI 5.0 PSI 5.0 PSI <br /> Test Duration: 30MIN 30MIN 30MIN <br /> Change in Reading(RF-RI): 0 0 0 <br /> Pass/Fail Threshold: -.2 PSI -.2 PSI -.2 PSI <br /> Test Result: PASS PASS PASS <br /> Comments— (include information on repairs made prior to testing) <br /> SWRCB December 2001 <br />