Laserfiche WebLink
. Page of <br /> 6. SUBMERSIBLE PUMP CONTAINMENT SUMP TESTING <br /> Test Method Developed By: X Sump Manufacturer Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Uses: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Specie) <br /> Measuring Equipment Used for Testing:UST 2000P <br /> Sump#1 RU Sump#2 PLUS Sump#3 SU <br /> Sump Diameter: 42" 42" 42" <br /> Sump Depth: 56" 55" 56" <br /> Sump Material: Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Highest 19" 11" 14" <br /> Piping Penetration: <br /> Height from Tank Top to Lowest 20„ 17" 18" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: FAIR FAIR FAIR <br /> Portion of Sump Tested' 2"ABOVE PRODUCT 2"ABOVE PRODUCT 2"ABOVE PRODUCT <br /> PENETRATION PENETRATION PENETRATION <br /> Wait time between applying 15MIN 15MIN 15MIN <br /> pressure/vacuum/water and starting test: <br /> Test Start Time: 0843 0911 1036 <br /> Initial Reading(RI): .1048 .9185 .5280 <br /> Test End Time: 0855 0923 1048 <br /> Final Reading(RF): .1049 .9182 .5275 <br /> Test Duration: 12MIN 12MIN 12MIN <br /> Change in Reading(RF-RI): +.0001 -.0003 -.0005 <br /> Pass/Fail Threshold: +/-.002" +/-.002" +/-.002" <br /> Test Result: PASS PASS PASS <br /> Was sensor removed for testing? YES YES YES <br /> Was sensor properly replaced after YES YES YES <br /> testing? <br /> Comments— (include information on repairs made prior to testing) <br /> SWRCB December 2001 <br />