My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
2300 - Underground Storage Tank Program
>
PR0231125
>
COMPLIANCE INFO_1996-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 11:40:15 AM
Creation date
6/23/2020 6:43:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2004
RECORD_ID
PR0231125
PE
2361
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
01
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231125_1210 E HAMMER_1996-2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE BRAVO BOR IS ONLY <br />7-1/2 INCHES DEEP <br />WHY A SHALLOW <br />BOX DESIGN? <br />The 7-1/2" deep box (measured <br />from island floor to bottom of <br />the box) helps eliminate a large <br />volume of combustible matter, <br />lessening the explosion danger. <br />(Actual box depth with optional <br />UL approved brackets is 8-1/2".) <br />•A deeper box increases the fuel <br />to oxygen level, heightens the <br />risk of explosion. <br />*The shallow Bravo Box is sus- <br />pended in concrete — not in <br />direct contact with the earthen <br />environment beneath it. <br />The Patented Shallow Bravo Box with new optional UL Approved Brackets <br />*Corrosive materials CANNOT <br />come in contact with the box. <br />Lightweight float causes <br />positive action of shear <br />•The shallow design allows easy <br />valve after leak of approxi - <br />mately 4 ounces of product <br />visual inspection and required <br />in the dispenser box. <br />pressure tests without dispenser <br />as <br />removal. <br />/�sE <br />•It is stronger than a deeper <br />box. A prime importance in the <br />event of a collision at the island. <br />TEST <br />TUBING <br />o \ <br />Arm connected to fusible <br />link of shear valve shuts <br />down valve automatically. <br />Measured <br />from island <br />floor to bot- <br />tom of box. <br />• <br />U <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.