My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2004-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 1:03:59 PM
Creation date
6/23/2020 6:44:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2007
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231126_1469 E HAMMER_2004-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tait Environmental <br />2880 Sunrise Blvd. Suite 206 <br />Rancho Cordova CA 95742 <br />RE: Circle K #2705447 @ 1469 E. Hammer Lane, Stockton <br />The permit to retrofit the existing piping and to tie into the existing diesel line at the above referenced <br />location is approved with the following conditions: <br />1. Contact the fire department and San Joaquin Valley Air Pollution for their permit requirements. <br />2. Samples must be taken and analyzed as stated on pages 4 and 5 of the permit application. <br />3. All removed piping will be decontaminated prior to removal. <br />4. A third party certified tank integrity test must be performed on the diesel tank and results <br />received prior to scheduling the final inspection <br />5. A third party certified piping line tightness test must be performed and results prior to <br />scheduling the final inspection. <br />6. If automatic pump shut down is provided it must satisfy all conditions listed in section 2636(g) <br />of California Code of Regulations (CCR). <br />7. All piping and connections shall bear a UL label. <br />8. All piping must slope to a containment sump with an audible and visual alarm. <br />9. All equipment in contact with backfill must have corrosion protection. <br />10. All monitoring equipment must be listed in LG -113. <br />11. Contact EHD for the following inspections: <br />a. Soil sampling under the dispensers and for the piping that is to be removed. <br />b. Primary piping inspection <br />�- c. Secondary piping inspection <br />d. 24 hour lake test on dispenser pans <br />e. Final inspection <br />12. Any changes in information or scope of work must be submitted to EHD prior to <br />commencing work. <br />13. See permit application for any additional changes. <br />14. A final inspection must be performed prior to this returning this station to operation. <br />15. Submit an As -Built plan to EHD at the time of the final inspection. Note: A final inspection <br />will not be performed unless the as-builts are submitted. <br />Permit expires March 19, 2003. <br />If you have any questions please contact me at (209) 468-9847. <br />Thtpyoµ, _ W <br />Michelle Le, Senior HS <br />Registered Environmental Health Specialist <br />0 <br />HEALTH EPARTMENT <br />ENVIRONMENTAL- <br />SAN JOAQUIN COUNTY <br />Unit Supervisors <br />2 �y A. ? <br />Donna K. Heran, R.E.H.S. <br />FlCarl Bor man, R.E.H.S. <br />304 East Weber Avenue, Third Floor g <br />. <br />(} S <br />• Lam' • <br />Director <br />Al Olsen, R.E.H.S. <br />Mike Huggins, R.E.H.S., R.D.I. <br />Stockton, California 95202-2708 Douglas W. Wilson, R.E.H.S. <br />cgC,FOR�P <br />Program Manager <br />Telephone: (209) 468-3420 Margaret Lagorio, R.E.H.S. <br />Laurie A. Cotulla, R.E.H.S. <br />Fax: (209) 464-0138 Robert McClellon, R.E.H.S. <br />Program Manager <br />Mark Barcellos, R.E.H.S. <br />December 19, 2003 <br />Tait Environmental <br />2880 Sunrise Blvd. Suite 206 <br />Rancho Cordova CA 95742 <br />RE: Circle K #2705447 @ 1469 E. Hammer Lane, Stockton <br />The permit to retrofit the existing piping and to tie into the existing diesel line at the above referenced <br />location is approved with the following conditions: <br />1. Contact the fire department and San Joaquin Valley Air Pollution for their permit requirements. <br />2. Samples must be taken and analyzed as stated on pages 4 and 5 of the permit application. <br />3. All removed piping will be decontaminated prior to removal. <br />4. A third party certified tank integrity test must be performed on the diesel tank and results <br />received prior to scheduling the final inspection <br />5. A third party certified piping line tightness test must be performed and results prior to <br />scheduling the final inspection. <br />6. If automatic pump shut down is provided it must satisfy all conditions listed in section 2636(g) <br />of California Code of Regulations (CCR). <br />7. All piping and connections shall bear a UL label. <br />8. All piping must slope to a containment sump with an audible and visual alarm. <br />9. All equipment in contact with backfill must have corrosion protection. <br />10. All monitoring equipment must be listed in LG -113. <br />11. Contact EHD for the following inspections: <br />a. Soil sampling under the dispensers and for the piping that is to be removed. <br />b. Primary piping inspection <br />�- c. Secondary piping inspection <br />d. 24 hour lake test on dispenser pans <br />e. Final inspection <br />12. Any changes in information or scope of work must be submitted to EHD prior to <br />commencing work. <br />13. See permit application for any additional changes. <br />14. A final inspection must be performed prior to this returning this station to operation. <br />15. Submit an As -Built plan to EHD at the time of the final inspection. Note: A final inspection <br />will not be performed unless the as-builts are submitted. <br />Permit expires March 19, 2003. <br />If you have any questions please contact me at (209) 468-9847. <br />Thtpyoµ, _ W <br />Michelle Le, Senior HS <br />Registered Environmental Health Specialist <br />
The URL can be used to link to this page
Your browser does not support the video tag.