My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2004-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 1:03:59 PM
Creation date
6/23/2020 6:44:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2007
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231126_1469 E HAMMER_2004-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />,/NT TAIT & Associates, Inc. <br />Engineering • Planning • Surveying <br />December 23, 2003 <br />San Joaquin County Environmental Health <br />304 E. Weber Ave, 3rd Floor <br />Stockton, CA 95202 <br />• <br />Via Overnight Delivery <br />DEC 2 4 2003 <br />Attention: Michele Le ENVIRONMEN I HEAi-1 H <br />PERMIT/SERVICES <br />(209) 468-9847 <br />RE: PROPOSED CIRCLE K — Dispenser Replacement and Fuel line modification <br />1469 E. Hammer Lane, Stockton, CA <br />Tait Job # TC871, Circle K Site # 2705447 <br />Dear Michele, <br />Per my phone call to you yesterday I am sending you 3 sets of revised plans for the above <br />project. We will cap -off the T -section of the vapor recovery line leading to the diesel <br />tank, as depicted on Sheet C-0 (instead of disconnecting at the tank sump). I have added <br />a slab detail on Sheet Detail -1 for the slab repair required by this additional work. <br />In addition, we have revised the notes on Sheet C-0 in response to City of Stockton - <br />Building Department comments dated 12/15/03. <br />Upon your review, if you have any questions or require additional information, I may be <br />reached at (916) 669-1816 or via e-mail at ad r c sac.tait.com . Thank you for your <br />assistance on the matter. <br />Sincerely, <br />0;'CtAmy . Dy <br />Project Coordinator <br />Encl. as noted above <br />1. UJENTSITOSCOI Tc871ISan Joaquin County Env Health Michele Le 031223. doc <br />2880 Sunrise Blvd. • Suite 206 • Rancho Cordova, California 95742 • (916) 635-2444 • (916) 635-2606 fax <br />Other Offices: Santa Ana • San Diego • Concord • Phoenix • Tucson <br />www.TAIT.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.