My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2008-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 1:24:34 PM
Creation date
6/23/2020 6:44:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2010
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231126_1469 E HAMMER_2008-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTRODUCTION <br />INTRODUCTION <br />FIBER GLASS SYSTEMS <br />PIPE INSTALLATION HANDBOOK <br />UL/ULC Listed Smith Fibercast <br />RED THREAD IIA Product Primary and <br />Secondary Containment Pipe and Fittings <br />This manual is offered to assist in the proper fabrication <br />and installation procedures when assembling Fiber Gass <br />Systems (FGS) piping systems. <br />This manual covers the installation procedures for FGS <br />RED THREAD IIA primary and secondary containment pipe <br />and fittings. <br />Part one details installation procedures for 2", 3", and 4" (50, <br />75, and 100 mm) diameter primary product piping. <br />Part two explains installation procedures for 3", 4" and 6" <br />(75, 100 and 150 mm) diameter secondary containment <br />piping. The 6" (150 mm) secondary containment piping is <br />not UL Listed. <br />ENGINEERING AND PRODUCT DATA: <br />FGS provides Success by Design <br />software to perform flow and other <br />calculations. Included in the CD -Rom <br />is a complete catalog and installation <br />video. Contact your FGS representative <br />to obtain a copy or visit our web site at <br />www.smithfibercast.com/ULPiping.htm. <br />Fiber Glass Systems' products must be installed and used in <br />accordance with sound, proven practice and common sense. <br />The information supplied by FGS in its literature must be <br />considered as an expression of guidelines based on field <br />experience rather than a warranty for which FGS assumes <br />responsibility. FGS offers a limited warranty of its products in the <br />Terms and Condhons of Sale. The information contained in the <br />literature and catalogs furnished by FGS cannot ensure, of itself, <br />a successful installation and is offered to customers subject to <br />these limitations and explanations. <br />It is the policy of Fiber Glass Systems to improve its products <br />continually. Therefore, the company reserves the right, without <br />notice, to change specifications and/or design at any time without <br />Incurring an obligation forequipment previously sold. Descriptions <br />contained in this catalog are for the purpose of identification and <br />neither limit nor extend the standard product limited warranty set <br />forth in the Terms and Condtbns of Sale and Trade Customs. <br />H <br />SAFETY <br />This safety alert symbol indicates an important <br />safety messsacie. When this symbol is visible, be <br />alert to the possibility of personal injury. <br />CAUTION <br />This pipe may carry hazardous material and/or operate <br />at a hazardous pressure level; therefore, it is imperative <br />the instructions in this manual are followed to avoid serious <br />personal injury or property damage. In any event, improper <br />installation can cause injury or damage. Installers should <br />read and follow all cautions and warnings on adhesive kits, <br />heat packs, propane torches, etc. to avoid personal injury. <br />Also, observe general safety practices With all saws, tools, <br />etc. to avoid personal injury. Wear protective clothing when <br />necessary. Make sure work surfaces are clean and stable <br />and that work areas are properly ventilated. <br />INSTALLATION TRAINING SEMINARS <br />Fiber Gass Systems requires installers to attend training <br />every three years by a factory -trained representative. Fiber <br />Glass Systems offers in-depth training seminars covering <br />both primary product and secondary containment piping <br />installation procedures. The training seminar involves hands- <br />on participation, and each attendee receives a complete FGS <br />Smith Fibercast Petroleum Marketing Catalog containing <br />installation manuals used during the seminar. Each installer <br />attending also received documentary proof of attendance. <br />It is recommended that anyone directly involved in <br />underground piping installations attend the FGS Smith <br />Fibercast installation training seminar. For information <br />on training seminars, contact your local distributor or <br />representative. <br />To assist installers With proper installation of fiberglass <br />piping systems, Fiber Gass Systems has prepared a Red <br />Thread IIA Installation Checklist for Underground Petroleum <br />Pipe. This sheet is included in the FGS Smith Fibercast <br />Petroleum Marketing Catalog and accompanies each <br />bundle of pipe. For a copy of this checklist, contact your <br />local distributor or representative. <br />Publications available: <br />B2101 RED THREAD IIA Product Brochure <br />82102 General Specifications <br />B2104 Vacuum Monitoring System <br />82108 Bonded Sump Entryfrermination Fitting <br />B2109 Gasketed Sump Entryfrermination Fitting <br />82161 RED THREAD IIA Installation Checklist <br />F6600 1 %6" Tapering Tool Instructions <br />F6625 Model 2100 Power Tool Instructions <br />F6624 Model 2102 Power Tool Instructions <br />Case Histories <br />F6640 Operating Instructions for Electric Heating Collar <br />
The URL can be used to link to this page
Your browser does not support the video tag.