Laserfiche WebLink
0 <br />Secondary Contain- • <br />the entryfitting againstthe outsidesump wall while <br />inside.pressing ft metal ring against the alignment ring on the <br />curing10. Do not disturb assembly until the adhesive is cured. This <br />Includes bonding of pipe to the entry fitting and Installing <br />the t1hreaded outlet fiffing. Clean excess adhesive from <br />all bonding surfaces. See adhesive kit instructions lbr <br />cure time. <br />11. The use of an industrial hot air gun may speed up the <br />process. i. not overheat. <br />fight.12. Remove 1W plastic threaded outlet protector. Apply <br />adhesivetothe 11/4"fitting and screwinto the 1/4" threaded <br />outlet. Tighten to 40 in4bs or 11/2-2 turns past hand <br />Atter Installingfining, X.:_sure the interstitial <br />space is free from excess adhesive. Install a short hose <br />i blowexcess adhesive throughthe airpassage. <br />13. Conned only flexible tubing or hoses to the 1/4" <br />" outlet NOTE:- Tubing or hoses must be rated to full <br />14. Bond primary pipe. <br />16. After primary pipe has been tested, use a concentric <br />reducer to bond is entry/termination fitting 1•: <br />terminationthe secondary containment piping. Do not use a dam <br />shell termination fitting in place of the concentiric ireducer. <br />See example bel <br />Refer o Bulletin No.s 1 r ore detailed information. <br />Outside Sump <br />Encylr—rumbn f k" Body Rlmp Wall <br />Alignment Riggs <br />—.J <br />HOLE 01A <br />I <br />Retaining Ring <br />B <br />A <br />I TERMINATION EXAMPLE using <br />SUMP ENTRY/TERMINATION FITTINGS <br />Primary Pipe Red Thread IIA <br />1 Concentric Reducer <br />1 - <br />® O <br />2-J ntainment Pipe <br />d Thread II A <br />Sump Entry/Termination <br />Fitting <br />Spigot x NPT Adapter or <br />Spigot x Spigot Mppie <br />[us <br />• Sump Entry/Termination Fitting With Gasket <br />using1 . Determine entry hole location and cut entry hole in sump <br />wall dimensions f <br />2. Plow sump entry/termination fitting Owugh hole with <br />the threads on ft inside of the sump wall. A maximum <br />of r of offset is acceptable for a proper seal on a flat <br />suftce. For a rounded surfince, no offset will be alkiwed; <br />3. Locate 1/4' threaded outlet to the desired location. For a <br />gravity drain or open system, the 1/47 threaded outlet <br />should is located the t dclock position. <br />installation.plastic threaded outlet protector in place until Ile fitfing <br />4. Lube gasket with a water-based lubricant and place over <br />the threads t agaisump wall. <br />nst the <br />5. -.a nut onto fitting hand tight. <br />threaded6. Apply adhesive to the 11-e fitting and screw into the 1/4, <br />outlet.Tighten one quarterturnpast hand <br />tight. Installing hose connection.be sure the <br />interstifial space is free from excess adhesive. Instal a <br />short hose and blow excess adhesive through air <br />passage. <br />7. Connect only flexible tubing or hoses to the 1/4" <br />side outlet NOTE: Tubing or hoses must be rated to fdl <br />2. Alow adhesiveto cure before banding Y pipe, <br />testing K.. applying adhesive instructions <br />for ! <br />Q. <br />.. of an industrial <br />curing process. Do not overheat. <br />10. • ! primary pipe. <br />11. Tighten the nut again aiter bonding and curing the joint. <br />12. Aftw primary pipe has been tested, use a concentric <br />reducer to bond the sump entryttermination fitting to <br />,..,.a secondarycontainment piping. Foe not use t clam <br />shall termination fitting : place . the concentricreducer. <br />See termlinatlon exampleusing Sump a <br />Fittingson f.•' 19. <br />Sump Wall <br />A Cl Gasket <br />Gasket Nut <br />Lube <br />Hole I <br />Dia.I <br />I <br />Entryfffrer <br />r <br />Fitting <br />Body . a . a <br />Inside Sump <br />