My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2011-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2021 1:51:31 PM
Creation date
6/23/2020 6:44:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2012
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231126_1469 E HAMMER_2011-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TANK ANNULAR TESTING <br /> Test Method By: • Manufacturer O Industry Standard O Professional Engr. O Other(see below) <br /> Test Method Uses: O Pressure • Vacuum o Hydrostatic o Other(see below) <br /> Measuring Equipment Used: Vacuum Gauge (range 0 to 30 inches Hg) <br /> Description Tank#1 Tank#2 Tank#3 Tank#4 <br /> Product stored Gasoline-91 Gasoline-89 Gasoline-87 Diesel <br /> Tank manufacturer Unknown Unknown Unknown Unknown <br /> Tank material Steel Steel Steel Steel <br /> Tank capacity (US gallons) 10,000 10,000 12,000 10,000 <br /> Is this a multi-compartment tank? No No No No <br /> Dry or Brine filled annular? <br /> Monitoring system show normal annular? <br /> Is water table above tank bottom? <br /> Was sensor removed for testing? <br /> Was sensor properly replaced after testing? <br /> Wait time for vacuum to stabilize (hr:min) <br /> Test start time <br /> Initial vacuum (inches Hg) <br /> Test end time <br /> Final vacuum (inches Hg) <br /> Test duration (hr:min) <br /> Change in vacuum (inches Hg) <br /> Pass/Fail threshold (inches Hg/hour) <br /> TEST RESULT <br /> Comments: <br /> © 2011 Walton Engineering,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.