My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2011-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2021 1:51:31 PM
Creation date
6/23/2020 6:44:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2012
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231126_1469 E HAMMER_2011-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> low <br /> SECONDARY LINE TESTING <br /> Test Method By: O Manufacturer • Industry Standard o Professional Engr O Other(see below) <br /> Test Method Uses: • Pressure o vacuum o Hydrostatic o Other(see below) <br /> Measuring Equipment Used: Pressure Gauge (range Q to 15 psig) <br /> Description Line#1 Line#2 Line#3 Line#4 <br /> Tank product Gasoline-91 Gasoline-89 Gasoline-87 Diesel <br /> Pipe manufacturer Smith Smith Smith Smith <br /> Pipe material FRP FRP FRP FRP <br /> Primary pipe diameter (inches) 2 2 2 2 <br /> Secondary pipe diameter (inches) 3 3 3 3 <br /> Method of secondary pipe isolation Boot Boot Boot Boot <br /> Location of secondary pipe isolation Sump Sump Sump Sump <br /> Estimated length of piping run (feet) 255' 245' 235' 200' <br /> (include length of branch runs) <br /> Wait time for pressure to stabilize (hr:min) 0:05 0:05 0:05 0:05 <br /> Test start time 11:00 AM 10:50 AM 10:45 AM 10:49 AM <br /> Initial pressure (psig) 5.0 5.0 5.0 5.0 <br /> Test end time 12:00 PM 11:50 AM 11:45 AM 11:49 AM <br /> Final pressure(psig) 5.0 5.0 5.0 5.0 <br /> Test duration (hr:min) 1:00 1:00 1:00 1:00 <br /> Change in pressure (psig) 0.0 0.0 0.0 0.0 <br /> Pass/Fail threshold (psig) 0.5 0.5 0.5 0.5 <br /> TEST RESULT PASS PASS PASS PASS <br /> Comments: <br /> 0 2011 Walton Engineering,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.