My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2011-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2021 1:51:31 PM
Creation date
6/23/2020 6:44:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2012
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231126_1469 E HAMMER_2011-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECONDARY LINE TESTING <br />Test Method By: o Manufacturer 0 industry Standard o Professional Engr o Other (see below) <br />Test Method Uses: a Pressure o vacuum o Hydrostatic o Other (see below) <br />Measuring Equipment Used: PressureGauge (range 0 to 15 psig) <br />Mmr-rinfinn i inn Am (_inn MI l in t!_; 1 lnAb RA <br />Tank product <br />CASORM - 91 Gasoline - 09 Gasoline - 87 Diesel <br />Pipe manufacturer <br />_sna Smith Smith sneth <br />Pipe material <br />_ <br />FRP <br />Primary pipe diameter (kid*&) <br />2 — <br />SacwWary pipe diameter (inches) <br />3 <br />Method of pipe isolation <br />Boot <br />Location of secondary pipe isolation <br />Sump— <br />Estimated bnpth of p"V run (feat) V <br />300 ----- <br />tnduda WVM of branch runs <br />- -- <br />Wait time for pressure to stabilize (hr:min) <br />0:05 <br />Teal start time _ _ <br />_ <br />11:01 AM � - —_-- --- -------- <br />Initial pressure (pslg) <br />5.0 <br />Test and time <br />12:01 PM <br />Final pressure (pslp) <br />4.0 --- <br />Test duration (hrmin) _ <br />1:00 <br />Change in pressure (pot) <br />10- <br />PasslFait itxesflold (psig) <br />0.5 —1 <br />TEST RESULT <br />FAIL <br />Comments: <br />Line 02 is a syphon line connecting to tank #4 at: d w STP sump. <br />The 91 Failed from unknown location. The UDC* and STP sump was flooded to coMlrm leak was not above <br />ground. - <br />corn r rramn rngrawaq, arc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.