Laserfiche WebLink
SECONDARY LINE TESTING <br />Test Method By: o Manufacturer 0 industry Standard o Professional Engr o Other (see below) <br />Test Method Uses: a Pressure o vacuum o Hydrostatic o Other (see below) <br />Measuring Equipment Used: PressureGauge (range 0 to 15 psig) <br />Mmr-rinfinn i inn Am (_inn MI l in t!_; 1 lnAb RA <br />Tank product <br />CASORM - 91 Gasoline - 09 Gasoline - 87 Diesel <br />Pipe manufacturer <br />_sna Smith Smith sneth <br />Pipe material <br />_ <br />FRP <br />Primary pipe diameter (kid*&) <br />2 — <br />SacwWary pipe diameter (inches) <br />3 <br />Method of pipe isolation <br />Boot <br />Location of secondary pipe isolation <br />Sump— <br />Estimated bnpth of p"V run (feat) V <br />300 ----- <br />tnduda WVM of branch runs <br />- -- <br />Wait time for pressure to stabilize (hr:min) <br />0:05 <br />Teal start time _ _ <br />_ <br />11:01 AM � - —_-- --- -------- <br />Initial pressure (pslg) <br />5.0 <br />Test and time <br />12:01 PM <br />Final pressure (pslp) <br />4.0 --- <br />Test duration (hrmin) _ <br />1:00 <br />Change in pressure (pot) <br />10- <br />PasslFait itxesflold (psig) <br />0.5 —1 <br />TEST RESULT <br />FAIL <br />Comments: <br />Line 02 is a syphon line connecting to tank #4 at: d w STP sump. <br />The 91 Failed from unknown location. The UDC* and STP sump was flooded to coMlrm leak was not above <br />ground. - <br />corn r rramn rngrawaq, arc. <br />