My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2011-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2021 1:51:31 PM
Creation date
6/23/2020 6:44:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2012
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231126_1469 E HAMMER_2011-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n <br />OPW Installation, Operation, and Maintenance Manual, Page 59 <br />STEP 11: PREPARE DRILL AND BIT <br />Confirm that the stop on the 3/16" drill bit supplied <br />with the 71 SO -TOOL is in the correct position before <br />drilling. The stop is factory installed at a distance <br />between 2" to 2-1/16" from the tip. If the stop is not <br />at the correct position it must be fixed before drilling. <br />Caution: If the drill stop is not in the proper <br />location failure of a pressure decay leak test may <br />result. <br />Tip to stop dimension <br />must be 2 to 2-1/16 inch <br />Figure 11 <br />STEP 12: DRILL HOLES <br />With the inlet tube and 71SO-TOOL in place, <br />carefully drill a 3116" diameter hole in the upper tube <br />using the drill bushing in the knob as a guide. The <br />drill stop is positioned so it will bottom out against <br />the knob after the bit has drilled through the upper <br />drop tube. If the stop is positioned wrong either no <br />hole will be drilled, or a through hole could <br />potentially be drilled through the inlet tube. If no <br />hole is drilled return to step 11 and check the stop <br />dimension. If a hole is drilled through the inlet tube <br />the assembly is not salvageable. Drill (2) more <br />holes in the two remaining knobs. <br />Drill thru upper <br />tube only <br />Figure 12 <br />11 <br />Executive Order VR -1 02-K <br />STEP 13: DIMPLE FIRST HOLE <br />Unthread one knob completely from the tool. <br />Remove any chips or burrs from the drilling <br />operation. Place the assembly on a solid surface <br />keeping the other two knobs in place. Using the <br />punch supplied with the 71 SO -TOOL align the tip of <br />the punch with the drilled hole and dimple the upper <br />drop tube by striking the punch with a hammer until <br />drop tube is formed into countersunk hole in inlet <br />tube. After punching, remove any chips that may <br />have fallen into the inlet tube screw hole. <br />Align punch with <br />drilled hole <br />Figure 13 <br />STEP 14: ASSEMBLE FIRST SCREW <br />Ensure that the drop tube was formed into the <br />countersunk screw hole as shown in Figure 14 if not <br />return to step 13. Apply black moly grease to screw <br />and tighten first screw into inlet tube with a <br />screwdriver. Use only the taptite screws that are <br />supplied with the unit. Seating torque is 20 in -lbs <br />min. to 35 in -lbs max. Screw head should be flush <br />with the drop tube. Do not over tighten. <br />Figure 14 <br />Ensure drop tube is formed into <br />countersunk hole <br />OPW 71 SO Overfill Prevention Valve Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.