My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2011-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2021 1:51:31 PM
Creation date
6/23/2020 6:44:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2012
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231126_1469 E HAMMER_2011-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ll <br />OPW Installation, Operation, and Maintenance Manual, Page 58 Executive Order VR -1 02-K <br />STEP 6: APPLY GREASE TO DROP TUBE <br />STEP 8: INSTALL INLET TUBE <br />Apply black moly grease to the inside diameter of <br />Insert the inlet tube into the upper tube until the <br />the upper drop tube. Make sure coverage is <br />upper tube seats against the flange on the inlet tube. <br />completely around the tube as shown in Figure 6. <br />Ensure polypak is inserted evenly and stays in inlet <br />Figure 6 <br />STEP 7: APPLY GREASE TO POLYPAK SEAL <br />Ensure that the polypak seal is installed on the inlet <br />tube with the lip up as shown in Figure 7. Apply <br />black molt' grease to the polypak as shown. Make <br />sure coverage is completely around the polypak <br />seal. <br />mgure r <br />.uUW <br />STEP 9: INSERT 71SO-TOOL OVER INLET TUBE <br />To install the 71 SO -TOOL (sold separately) over the <br />inlet tube, first loosen all three knobs so the tool can <br />pass freely over the inlet tube flange. Align the slot <br />on the tool with the key on the inlet tube and insert <br />the tool down. See Fioure 9 <br />Loosen <br />all <br />Hand <br />Tool slot knobs <br />View holes tighten <br />knobs <br />evenly <br />Inlet <br />Tube <br />key <br />Figure 9 Figure <br />10 <br />STEP 10: TIGHTEN THE 71 SO -TOOL <br />Use the three view holes to ensure that the tool <br />seats out flat against the top of the inlet tube. To <br />prevent vertical movement of the tool during drilling <br />hand tighten all three knobs evenly tight against the <br />upper drop tube. See Figure 10. <br />OPW 71 SO Overfill Prevention Valve Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.