Laserfiche WebLink
SWRCB, January 2002 <br />Page _3_ of —8- <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: <br />❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />® Pressure ❑ Vacuum <br />❑ Other (Spec) <br />❑ Hydrostatic <br />Test Equipment Used: 0 —15 PSI GAUGES <br />Equipment Resolution: + I - 0.002" <br />MENEMPiping <br />Run # 91 <br />Piping Run # 89 <br />Piping Run # 87 <br />Piping Run # DIESEL <br />Piping Material: <br />FIBERGLASS <br />FIBERGLASS <br />FIBERGLASS <br />FIBERGLASS <br />Piping Manufacturer: <br />A.O. SMITH <br />A.O. SMITH <br />A.O. SMITH <br />A.O. SMITH <br />Piping Diameter: <br />2" 13" <br />2" / 3" <br />2"/ 3" <br />2" / 3" <br />Length of Piping Run: <br />135' <br />135' <br />135' <br />135' <br />Product Stored: <br />91 <br />89 <br />87 <br />DIESEL <br />Method and location of <br />piping -run isolation: <br />TEST BOOT / <br />STP SUMP <br />TEST BOOT I <br />STP SUMP <br />TEST BOOT I <br />STP SUMP <br />TEST BOOT I <br />STP SUMP <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />10 MIN <br />10 MIN <br />10 MIN <br />10 MIN <br />Test Start Time: <br />9:00 AM <br />9:00 AM <br />9:00 AM <br />9:00 AM <br />Initial Reading (RI): <br />5.0 PSI <br />5.0 PSI <br />5.0 PSI <br />5.0 PSI <br />Test End Time: <br />10:00 AM <br />10:00 AM <br />10:00 AM <br />10:00 AM <br />Final Reading (RF): <br />0.0 PSI <br />5.0 PSI <br />5.0 PSI <br />5.0 PSI <br />Test Duration: <br />1 HR <br />1 HR <br />1 HR <br />1 HR <br />Change in Reading (RF -RI): <br />-5.0 PSI <br />0 PSI <br />0 PSI <br />0 PSI <br />Pass/Fail Threshold or <br />Criteria: <br />NO LOSS <br />NO LOSS <br />NO LOSS <br />NO LOSS <br />Test R lt�> C�1 "Pass Z, Fail I"('ss ElFall Pass ❑ Fail' Pstss; ❑._ + a . <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />91 PRODUCT SECONDARY LINE FAILED 5.0 PSI PRESSURE TEST -- LEAKS WERE FOUND INSIDE UDC# 7 - 8 ON <br />TERMINATION BOOT. <br />87 PRODUCT SECONDARY LINE HAD REPAIRS MADE AT STP SUMP ON TERMINATION TEST BOOT INSTALLED <br />BLUE LINE S.R. 3.5X2.4A <br />