My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2011-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2021 1:51:31 PM
Creation date
6/23/2020 6:44:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2012
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231126_1469 E HAMMER_2011-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />Page _4_ of _8_ <br />Test Method Developed By: ❑ Sump Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: INCON SUMP TESTER <br />Equipment Resolution: + / - 0.002" <br />MEMEM <br />EM <br />Sump # 91 <br />Sump # 89 <br />Sump # 87 <br />Sump # DIESEL <br />Sump Diameter: <br />48" <br />48" <br />48" <br />48" <br />Sump Depth: <br />85" <br />87" <br />82" <br />86" <br />Sump Material: <br />FIBERGLASS <br />FIBERGLASS <br />FIBERGLASS <br />FIBERGLASS <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />18" <br />17" <br />17" <br />17" <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />15" <br />12" <br />10" <br />11" <br />Condition of sump prior to testing: <br />DRY <br />DRY <br />DRY <br />DRY <br />Portion of Sump Tested' <br />ABOVE <br />PENTERATION <br />ABOVE <br />PENTERATION <br />ABOVE <br />PENTERATION <br />ABOVE <br />PENTERATION <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />®Yes ❑ No ❑ NA <br />® Yes ❑ No [:INA <br />® Yes ❑ No ❑ NA <br />®Yes ❑ No ❑ NA <br />Turbine shutdown response time <br />3 SEC <br />3 SEC <br />3 SEC <br />Is system programmed for fail-safe <br />Shutdown?* <br />®Yes ❑ No ❑ NA <br />®Yes ❑ No ❑ NA <br />®Yes [—]No ❑ NA <br />®Yes []No ❑ NA <br />Was fail-safe verified to be <br />o erational?" <br />® Yes ❑ No ❑ NA <br />® Yes [—]No ❑ NA <br />® Yes ❑ No [:INA <br />❑ Yes ®No ❑ NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />10 MIN <br />10 MIN <br />10 MIN <br />10 MIN <br />Test Start Time: <br />10:40 AM <br />10:40 AM <br />11:59 AM <br />10:40 AM <br />Initial Reading (Rt): <br />3.8412" <br />3.5821" <br />4.6483" <br />5.8389" <br />Test End Time: <br />10:55 AM <br />10:55 AM <br />12:14 PM <br />10:55 AM <br />Final Reading (RF): <br />3.7805" <br />3.5819" <br />4.6497" <br />5.8389" <br />Test Duration: <br />15 MIN <br />15 MIN <br />15 MIN <br />15 MIN <br />Change in Reading (RF-Ri): <br />-0.0607" <br />-0.0003" <br />0.0010" <br />0.000" <br />Pass/Fail Threshold or Criteria: <br />+l- 0.002" <br />+/- 0.002" <br />+/- 0.002" <br />+1-0.00211 <br />Tis# Result: <br />❑ Pass °Fail <br />(Pass <br />❑Fail <br />Z Pass ❑ Fail, <br />®Pass ❑ 31'axl„ r <br />Was sensor removed for testing? <br />® Yes ❑ No ❑ NA <br />®Yes ❑ No ❑ NA <br />® Yes ❑ No [:INA <br />®Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />®Yes ❑ No❑ <br />[:INA <br />® Yes No ❑ NA <br />®ves ❑ No ❑ NA <br />®Yes ❑ No ❑ NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />ABOVE IS THE LAST OF TWO BACK TO BACK 15 MINUTE TESTS <br />DIESEL (4) STP SUMP RED JACKET TURBINE RELAY CONTACTS ARE FUSED SHUT IN CLOSE POSTION. TURBINE WILL <br />NOT SHUT -DOWN WHEN SENSOR DETECTS LIQUID OR AT FAIL SAFE / SENSOR OUT -- NEEDS TO BE REPLACED & <br />RETESTED. <br />91 STP SUMP FAILED HYDROSTATIC SUMP TEST -- LEAKS ARE BELOW TWO UPPER ELECTRICAL PENETRATIONS <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.