My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1612
>
2300 - Underground Storage Tank Program
>
PR0231127
>
COMPLIANCE INFO_1986-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 12:21:10 PM
Creation date
6/23/2020 6:44:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1996
RECORD_ID
PR0231127
PE
2361
FACILITY_ID
FA0003611
FACILITY_NAME
PARKWOODS GAS & FOOD
STREET_NUMBER
1612
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728002
CURRENT_STATUS
01
SITE_LOCATION
1612 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231127_1612 W HAMMER_1986-1996.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
529
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11lei ls •im' i*l <br />Initial: <br />Dlr.�--- <br />Arco. <br />ARCO Facility• ..09 <br />Manual tank gauging will be performed in accordance with the details of Section 2645, <br />instructions:4. Title 23, CCR (copy attached and hereby incorporated). <br />OPERATOR RESPONSIBILITIES <br />At a minimum, the OPERATOR will conduct gauging weekly according to the following <br />A. Tank liquid level measurements shall be taken at the beginning and ending of a gauging <br />period which shall be at least 36 continuous hours during which no liquid is added to or <br />removed from the tank. Record measurements on gauging log(Exhibit:• <br />B. The underground storage tank shall be secured to prevent inputs or withdrawals during <br />the gauging period. No inputs shall occur within the 12 -hour period preceding the <br />gauging period. <br />CL The liquid level measurements shall be based on an average of two consecutive stil <br />readings at both the beginning and ending of the period. <br />D. Measure the level of the product over the full range of • • the nearest <br />one-eighth of <br />E. If the variation between beginning and ending measurements exceeds the weekly or <br />monthly standards (Exhibit B); a second 36 hour test shall be commenced <br />immediately and all measurements and calculations checked for possible errors. If the <br />second test confirms a variation: • the weekly or monthly standards, <br />
The URL can be used to link to this page
Your browser does not support the video tag.