Laserfiche WebLink
A.. A tank integrity test shall be conducted within 72 hours.agency <br />properlythis 72 -hour period up to 30 calendar days, If all the contents of the underground tank <br />are safely and : period. <br />B. If the results of a tank integrity test conducted under the requirements of CCR, Title <br />23, Chapter 16, Article 4, Section 2645, Subsection (c)(3) confirm an unauthorized <br />release, ARCO Maintenance shall comply with the requirements of CCR, Title 23, <br />Article 5 and replace, repair, or close the underground storage tank in accordance <br />with CCR.Article 3, 6, or 7 of Chapter 16. <br />Written records of all monitoring, testing, and maintenance performed shall be maintained <br />on-site or off-site at a readily available location for a period of at least 5 years. These <br />records• ..madeavailable, •:♦request ♦ hours,to localagency or <br />Board. <br />