My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1612
>
2300 - Underground Storage Tank Program
>
PR0231127
>
COMPLIANCE INFO_1986-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 12:21:10 PM
Creation date
6/23/2020 6:44:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1996
RECORD_ID
PR0231127
PE
2361
FACILITY_ID
FA0003611
FACILITY_NAME
PARKWOODS GAS & FOOD
STREET_NUMBER
1612
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728002
CURRENT_STATUS
01
SITE_LOCATION
1612 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231127_1612 W HAMMER_1986-1996.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
529
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14. ARCO #548, 1512 Hammer Lane/Brentwood, Stockton, CA l®®/ O <br />Nanw of supgiw, Owner of Deew Address No, and Straet(s) City State Dore or Test <br />15. TANK TO TEST 16. CAPACITY <br />Nominal Capacity <br />Gent" by poyoon Gallons <br />�G Is thio* doubt as to True Capacity ) <br />11111111AM .nit vena Sa Section "OETERMI NINO TANK CAPACITY" <br />17. FILL -UP FOR TEST <br />r <br />By most accurate <br />capacity chart available <br />Gillen <br />Inventory <br />Stick Readings <br />to % In. <br />From <br />Station Chart <br />' Tank Manufacturer's Chan <br />JCompany Engineering Data <br />Charts supplied with PC sL� <br />Other <br />Total Ges ons <br />Gallons on. Reading <br />3,P93 <br />OR EACH METERED DELIVERY OUANTITY <br />Fina up. STICK BEFORE AND AFTER EACH COMPARTMENT DROP <br />d <br />�j /'1 <br />Tank er / /r, <br />Product In full tank (up to fill pipe) <br />_ <br />18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK <br />VAPOR RECOVERY SYSTEM <br />Sea manual sections applicable. Chock below and record procedure in log (26). <br />❑ Stage 1 <br />❑ Water In tank ❑ High water table M tank excavation <br />® Line(s) being tested with LVLLT <br />❑ Stage 11 <br />21. TEMPERATUREIVOLUME FACTOR (a) TO TEST THIS TANK <br />19. TANK MEASUREMENTS FOR <br />is Today Ythrmer? I J Colder? I ; _• F Product in Tank _• F Fill -up Product on Truck _° F Expected Change 1 • or I <br />TSTT ASSEMBLY <br />soften of tank to Grade ................... � / r, <br />22. 1 "' S <br />7312!:14 °F <br />Add 3G" for 4" l _ " <br />Thermal -Sensor reading after circulation _ <br />digits <br />3 Z <br />Nearest <br />Add 24" for r L a air seat ....... " <br />23. Digits par •F M range of expected change <br />_ <br />Total tubing to assemble Approximate" <br />Approximatev <br />digits <br />24. i ® • 4005 9 /S5 <br />s 2. 3 %5 23 3 �5" 9aliona <br />20. EXTENSION NOSE SETTING <br />x <br />total quantity In coefficient of expansion for <br />volume Change in this tank <br />•F <br />Tank top to grad* .................................. <br />full tank (16 or 17) involved product <br />per <br />Extend hose on suction tube a" or more <br />below tank top <br />25. ;2. ;i ?E 2-3 3 86" r. 3 Zy <br />-0073-2 h D 1 is I: <br />..................................... _" <br />volume change par •F (24) Digits per •F In test <br />Volume change par digit. to <br />*if Fill pipe extends above grade, use top of fill. <br />Range (23) <br />Compute to 4 decimal places faeta (a) <br />•O07 <br />OBSERVED GRAVITY - Lg <br />OBSERVED TEMPERATURES -7, <br />CORRECTED API GRAVITY <br />C. 0. E. 1000s"h <br />
The URL can be used to link to this page
Your browser does not support the video tag.