My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1612
>
2300 - Underground Storage Tank Program
>
PR0231127
>
COMPLIANCE INFO_1986-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 12:21:10 PM
Creation date
6/23/2020 6:44:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1996
RECORD_ID
PR0231127
PE
2361
FACILITY_ID
FA0003611
FACILITY_NAME
PARKWOODS GAS & FOOD
STREET_NUMBER
1612
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728002
CURRENT_STATUS
01
SITE_LOCATION
1612 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231127_1612 W HAMMER_1986-1996.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
529
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14 ARCO #548, 1512 Hammer Lane/Brentwood, Stockton, CA <br />Nerve N Suppum. owner of Dal" Address No. and Strom(s) City State Dare or Test <br />15. TANK TO TEST��% 1S. CAPACITY <br />(o(! Nominal Capacity <br />lis"thy by GelbnO <br />Is there doubt as to True Capacity T <br />r.nd .rd SN Section "DETERMINING TANK CAPACITY" <br />11. FILL -UP FOR TEST <br />r <br />By most accurate <br />capacity chart available <br />Gatto <br />I= <br />From <br />boon Chart <br />Tank Manufacturer's Chart <br />J Company Engineering Data ate <br />�J Charts supplied with t..L� <br />-� Other <br />Stick Readings <br />to % in. Gallons <br />Total Gallons <br />as. Reading <br />.3%7Lf <br />ANIL <br />Fig up. STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY OUANTITY <br />at 7— <br />Tank Di / <br />Product in full tank (up to fill pipe) <br />_ <br />18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK <br />VAPOR RECOVERY SYSTEM <br />See manual sections applicable. Check below and record procedure In log (26). <br />❑ Stage I <br />® Water In tank C:] High water table In tank excavation <br />® Line(s) being tested with LVLLT <br />[:] Stage 11 <br />21. TEMPERATURENOLUME FACTOR (a) TO TEST THIS TANK <br />19. TANK MEASUREMENTS FOR <br />Is Today Warmer? I J Colder? i i ._' F Product in Tank _• F Fill -up Product on Truck F Expected Change ( or 1 <br />TSTT ASSEMBLY <br />actions of tank to Grade' .................... <br />22. Thermal -Sensor reading after circulation 1 5 `w t <br />70 7/ 'F <br />Add 3C for 4" L " <br />Add 24" for r L air sed <br />dgas <br />23. Digits IF In of expected change 3 i <br />Nearest <br />or ....... <br />Total tubing to assemble Approximate <br />per range <br />dqds <br />24. 7 ®� x i ®00.5 g i �G <br />,�, .3 G �L �i% � gaiton, <br />20. EXTENSION HOSE SETTING <br />" <br />total quantity In coefficient of expansion for <br />volume change in this tank <br />IF <br />Tank op to graft' .................................. <br />full tank (16 or 17) Involved product <br />per <br />Extant toss on suction tube e" or mac <br />�_" <br />25. G `il l I 3 - S <br />O 007 2 <br />aaw tart ............ <br />+ <br />— <br />volume change per IF (24) Digits per IF In test <br />Volume change per digit. test <br />'If Fix pipe extends above grads, use top of fill. <br />Range (23) <br />Compute to 4 decimal places( <br />laces factor (a) <br />- i <br />�._ <br />OBSERVED GRAVITY ,Sg_,'z- <br />OBSERVED TEMPERATURES %30 <br />CORRECTED API GRAVITY <br />C. 0. E. . 000 5V q (IL <br />
The URL can be used to link to this page
Your browser does not support the video tag.