My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1612
>
2300 - Underground Storage Tank Program
>
PR0231127
>
COMPLIANCE INFO_1986-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 12:21:10 PM
Creation date
6/23/2020 6:44:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1996
RECORD_ID
PR0231127
PE
2361
FACILITY_ID
FA0003611
FACILITY_NAME
PARKWOODS GAS & FOOD
STREET_NUMBER
1612
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728002
CURRENT_STATUS
01
SITE_LOCATION
1612 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231127_1612 W HAMMER_1986-1996.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
529
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19. Secondary container other t le -walled tanks (includes intercepti 0* <br />and detection systems). E on 2633 (f)) <br />A. Backfill in secondary container. ESection 2635 (c) 1-81 <br />B. Pore space of granular material used as backfill for primary container(s) complies with Section 2631 <br />(g). (Engineering data to support capacity requirement). <br />C. Two or more primary containers within secondary container. (include information on product <br />compatibility) <br />® 0. Secondary container capable of precluding highest anticipated groundwater. <br />E. Secondary container sloped to a monitoring sump from which leakage or precipitation can be detected <br />and removed. <br />F. Vater tight corner which extends at least a foot beyond each boundary of the secondary container <br />excavation, sloped to drain away from excavation. <br />20. Secondary container(s) thickness, density, composition, product compatibility. <br />Sized to contain unauthorized releases from primary containers to allow sufficient time for detection and removal. <br />(Section 2631 (c)) <br />21. Secondary container(s) volumetric requirements: (Section 2631 (e) (1) <br />and (2)) <br />_ A. Single primary containers = 100%. <br />B. Multiple primary containers = 150% of Largest primary container or 10% above aggregate. <br />22. Secondary container(s) open to rainfall. E Section 2631 (f)) <br />Volumetric requirements = 24 hours of 100 year storm in addition to primary container volumes. <br />23. Secondary container floor. ESection 2631 (i)l <br />A. Constructed on firm base. <br />8. Sloped to collection sump ( 1/8 inch per foot). <br />(1) one or more access casings installed in sump. <br />i(a) Size to allow removal of collected liquid. <br />(b) Extended to ground surface. <br />(o) Covered with a locked waterproof cap or <br />within a secured facility. <br />(d) Thickness allows for anticipated stresses. <br />(e) Construction materials are not weakened stored product or will not donate, <br />capture, or mask constituents to be monitored. <br />24. Membrane liner specifications. ESection 2631; k, 1, and m) <br />a <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.