My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1612
>
2300 - Underground Storage Tank Program
>
PR0231127
>
COMPLIANCE INFO_1986-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 12:21:10 PM
Creation date
6/23/2020 6:44:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1996
RECORD_ID
PR0231127
PE
2361
FACILITY_ID
FA0003611
FACILITY_NAME
PARKWOODS GAS & FOOD
STREET_NUMBER
1612
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728002
CURRENT_STATUS
01
SITE_LOCATION
1612 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231127_1612 W HAMMER_1986-1996.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
529
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n <br />25. PIPING INFORMATION <br />PIPING INFORMATION <br />TANK# TANKS 2 TANK# 3 TANK# 4 <br />DISTANCE from <br />DISPENSER to TANK <br />MANUFACTURER <br />A -O Smith <br />SYSTEM TYPE • <br />Pressure <br />CONSTRUCTION ** <br />Double Wall <br />Fiberglass <br />MATERIAL *** <br />LEAK DETECTION SYSTEM <br />Ronan X76S With LS 3 robe <br />100% METHANOL (014PATIBILITY with <br />Y e S <br />FRP <br />CORROSION PROTECTION <br />N A <br />* System Type; suction, pressure, andgravity <br />** Construction: single -walled, double. waited, tined -trench, etc. <br />*** Material Type; steel -iron, stainless-steel, fiberglass, etc. <br />26. Piping (cross-sectional diagram, including connections to tank and dispensers). <br />X Double wall piping or Secondary cantairment (Trench liner, etc.) <br />(1) product line (teak detector or automatic shut-off an <br />'w pressurized piping). <br />(2) Vent and vapor recovery tines if not designed to <br />prevent the entrance of standing fluids. (Ball float valve) <br />(3) Manways and other single walled pipe fittings on a <br />double --walled tank, if not designed to prevent the <br />entrance of standing fluid. <br />27. State Water Resources Control Board "Facility (A)" and "Tank Permit (a)" application forms submitted. <br />28. a Plan review and operating permit fees paid. <br />29. _ Monitoring and Response Plans submitted. <br />30. X Proof of financial responsibility on file. <br />31. What is the approximate depth to ground water: <br />(include source of information . borehole logs, monitoring well data, water <br />studies, etc.) <br />32. Total rxsmbor of tanks on site after installation: 4 <br />33. Any existing tanks to be removed or abandoned? YES XX NO E ) If yes, submit State Water Resources <br />Control Board "Facility Permit (B)" application form. <br />34, Responsible party(ies) shall submit a 'Letter of Camaitment" prior to the <br />installation of new tanks. (Applies to sites with documented soil and/or groundwater contamination) <br />35. County/City Fire District and Building Department notified. <br />36. REMARKS <br />--------------------------------------------------------------------------------------------------------------------------- <br />• <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.