Laserfiche WebLink
E. Other types oft <br />(1) Ch cat composition of material stored is pro0d. <br />(2) Chemical abstract service number (CAS#) <br />14. Overflow protection system (detail drawing of spill catchment basin(s)/piping sump(s) required, including tank fill and all <br />openings). [Section 2635 (b) (8)] <br />X A. Spill catchment basin. j <br />Capacity: 1 Ga� I®V1 <br />Type: CN I ' GST= 2 <br />B. Manual monitoring (motor vehicle fuels only). <br />(1) Written fitting procedure: [Section 2635 (9) (A) (8) (C)] <br />(a) Tank volume capacity is at 103% or +200 gallons. <br />(b) Metered product entering UST and tank capacity <br />determined immediately prior to filling. <br />X C. Mechanical/Electronic monitoring (manxiatory for non -motor vehicle fuel tanks) (Section 2635 (8) (A) (8) (C)) <br />X (1) Level sensing device and 92 or #3 below. <br />(2) Audibte/visual alarm triggered by a liquid level sensor. <br />X (3) Automatic shut-off. <br />15. Double -walled tank and system allow for monitoring of the annular space. <br />(Section 2635 (8) (A) (8) (C)] <br />A. Release from to container designed to drain to a specific location within the annular space to be detected by <br />a monitoring device or method. <br />B. Continuous electronic monitoring connected to audible/visual alarm system. <br />C. Type of Detectors (Detail of monitoring equipment as installed). <br />_ (1) Brand Names• Ronan <br />(2) Model Number: X765 <br />(3) Sensor Type: _ Vapor X _ Liquid both. L S 3 <br />_q1 (4) Sensor Specification. <br />Y (5) Brochures provided. <br />(6) Manufacturer's written installation instructions. <br />(7) Location of pr_obd for: 1W <br />(tank): �Yr' (piping): <br />16. Any special accessories, fittings, coatings, or linings not inherent within the initial design of the 10 tank or double- <br />wall UST. [Section 2631 (r)] <br />A. Approved by a nationally recognized independent testing organization. <br />B. Demonstration of integrity with the 10 tank or double walled UST. <br />17. Tanks subject to floatation. [Section 2631 (s)] <br />A. Anchored by deadman or stab. <br />B. Anchors to be installed as specified by manufacturer. <br />C. installation details provided on plans. <br />D. Calculations provided. <br />18. Fiber liners between tank(s) and excavation to prevent infiltration of native soil into backfill material. <br />