Laserfiche WebLink
SWRCB, January 2002 Page q of -7 <br />0 0 <br />6. PIPINGS TESTING <br />Test Method Developed By: 0 Sump Manufacturer D, Industry Standard <br />0 Other (Sped)5,) <br />Test Method Used: 0 Pressure <br />0 Other (Specify) <br />S Equipment Resolution: <br />Engineer I I <br />Sump # Sump# Z Sump # <br />Surnp <br />Sump Diameter: Z -1Z)' Y2, <br />Sump Depth: <br />Y71' <br />Sump Material: <br />5 jei x v loo <br />Height from Tank Top to Top of <br />Hi est Piping Penetration: 12 - <br />Height from Tank Top to Lowest <br />Electrical Penetration: -Z Y' 1 L, , <br />Condition of sump prior to testing: 1) r <br />r <br />'D <br />Portion of Sump Tested' (— 27 <br />Does turbine shut down when <br />sump sensor detects liquid (both FdYes DNo DNA <br />product and water)? <br />q7e, DNo DNA <br />Ves ONo DNA <br />11 YL 04o DNA <br />Turbine shutdown response time cb, - <br />kk 94 W C Id I <br />No ae,4 <br />Is system programmed for fail-safe <br />shutdown?" IIZ7es 0 No 0 NA <br />5kyes 11 No D NA <br />XVIes o No o NA <br />cYes � No DNA <br />Was fail - safe verified to be 0 Yes <br />Op at?* _12'No 11 NA <br />0Yes 0 NA <br />0 Yes pdQd D NA <br />n yes I❑ No 0 NA <br />Wait time between aI <br />pp ying <br />pressure/vacuunrwater )tnd starting <br />test: Vka 1_7_5 <br />If 1, <br />Test Start Time: 0c) <br />Initial Reading (Rj): rrvs4- Cyr (a <br />Fi-v, 4- ciyr <br />Test End Time: 1 t. 30 <br />Final Reading (RF): rf Is t_e <br />Test Duration:30 tl 10 eA­e5 <br />CA -f 1 `r5 <br />Change in Reading (RF -R,): t---) /j C, <br />"a <br />Pass/Fail Threshold or Criteria: <br />Test Result: ';f Pass 0 Faii <br />APass 11 Fail <br />VPass 11 Fail <br />CI Pass Fail <br />Was sensor removed for testing? es 0 No 0 NA <br />des D No 0 NA <br />D <br />0 No 0 NA <br />DYes ONi NA <br />Was sensor properly replaced and <br />verified functional after t!Ltm:�? X-Ves 0 No 0 NA\R.Yes <br />0 No DNA <br />XYes 0No DNA <br />< <br />bYes oNo 4A <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to M of the questions indicated with an <br />asterisk(*) is "NO" or "NA", the entire sump must be tested. (See SVIRCBLG-160) <br />