My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1612
>
2300 - Underground Storage Tank Program
>
PR0231127
>
COMPLIANCE INFO_2002-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 1:48:44 PM
Creation date
6/23/2020 6:44:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2009
RECORD_ID
PR0231127
PE
2361
FACILITY_ID
FA0003611
FACILITY_NAME
PARKWOODS GAS & FOOD
STREET_NUMBER
1612
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728002
CURRENT_STATUS
01
SITE_LOCATION
1612 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231127_1612 W HAMMER_2002-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRCB, January 2002 Page a of <br />7. UNDER -DISPENSER CONT NT QMCJ TESTING <br />Test Method Developed By: ❑ UDC Manufacturer -> ❑ Industry Standard ofessional Engineer <br />❑ Other (Spec) <br />Test Method Used ❑Pressure_,Rtl_❑,Vacuum�..w..�.r _ - .-,Iydrostatic <br />❑Other (Sped) <br />Test Equipment Used: �' v�41 (_e C %e,a_A.tW Equipment Resolution: <br />I . 7�—ft . ... <br />___ ,< - - — <br />UDC Manufacturer- `u o <br />Y"% ,� a <br />j fav <br />vLa s <br />v�vc� <br />ULt; iF 7f <br />/>vu vv <br />UDC Material: <br />UDC Depth: D 01 <br />!D <br />�'A0�. <br />Height from UDC Bottom to Top <br />of Hi est Pipig Penetration: 5-x-2 o,a✓,go,�- <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />„L� C° y,l �� <br />S 4W_ (�, <br />j <' <br />Condition of UDC prior to <br />testing: <br />� <br />Portion of UDC Tested G+>v v g P <br />( <br />Gtr ' <br />,v Acie <br />Does turbine shut down when <br />UDC sensor detects liquid (both ❑ Yes ;QNo ❑ NA <br />❑ Yes "o ❑ NA <br />❑ Yes E�Io ❑ NA <br />❑ Yes �'No ❑ NA <br />product and water ?° <br />�y <br />Turbine shutdown response time <br />rJ 1 A- <br />Fi <br />N <br />Is system programmed for fail- <br />safe shutdown?* ❑yes �7fiio ❑ NA <br />❑Yes 'PNo El NA <br />❑ Yes �lo ❑ NA <br />❑ Yes o [INA <br />Was verified to be <br />o e g onal?l-sa* <br />❑yes ❑ No F, A <br />❑Yes ❑ NoPNA <br />❑ Yes ❑ No �3NA <br />❑ Yes ❑ No P: VA <br />Wait time between a lying <br />pressure/vacu ater d <br />starting test /o r --t e►,+&44. 5 <br />Test Start Time: /. ,< 55 <br />f Z' 15- <br />12, o <br />12 o <br />Initial Readin r, -V, e"C C <br />y Give- l <br />F�s C�vc (c <br />Test End Time: /Z : Z S <br />2, `(s <br />Z ;-3 S-- <br />Final Reading ): r <br />�+� f G®t�G <br />-.a a 1� ire C <br />C <br />Test Duration: - 6C� <br />Change in Reading (RF -RI): a C <br />Pass/Fail Threshold or Criteria: <br />Test Result: ass ❑ Fail <br />Pass ❑Fail <br />Pass ❑Fail <br />Pass ❑Fail <br />Was sensor removed for testing? es ❑ No ❑ NA <br />es ❑ No ❑ NAi'es <br />❑ No ❑ NA <br />es ❑ No ❑ NA <br />Was sensor properly replaced and AYes 11 No El <br />verified functional after testin ? <br />21Ves [I No ❑ NA <br />,Ves ❑ No El NA <br />, Yes El No ❑ NA <br />Comments — (include information on re a' madeprior to testing, and recommended ollow-u or ailed tests) <br />1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to anv of thequestions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.