Laserfiche WebLink
- SWRCB, January 2002 Page—5 of 7 <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: iping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />❑ -Other (Spec) <br />Test Method Used: ssure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />TestEquipment j �� � �� u4t-% <br />5 0 „v,.,. Equipment Resolution <br />f' <br />nti <br />PipingRun # Piping Run # Z_ Piping Run # 3 TPiping Run # <br />Piping Material: <br />FI <br />6,k, <br />Piping Manufacturer: <br />i _. <br />Piping Diameter: <br />Length of Piping Run: <br />�D' L 2 0 'Al <br />0 ,1 °a U ' <br />YQ ® d �I <br />Product Stored: <br />�,,-�7 ,0 <br />� dI ��� � <br />' ✓ r',�� �,, <br />Method and location of <br />pip in -run isolation: <br />Tres 1- X20 K -k-6.4— <br />If <br />-1-� � Fav -F -Ce + <br />Wait time between applying <br />Z1. <br />t" ,� <br />LAU t <br />ressure/ uum/water and <br />Itest: <br />o u✓ <br />l.� o cA V <br />u u v <br />Test Start Time: <br />! Z: 6 b <br />t2, `, 2-0 <br />Initial Reading (Rt) <br />g' S <br />P S x <br />6' y <br />Test End Time: <br />L ': ! (� <br />E '- 2, L-> <br />r, 3o <br />Final Reading (RF): <br />P 5 :r <br />P53: <br />- !, <br />Test Duration: <br />a LA V <br />ou V A <br />t 1, Ou r <br />Change in Reading (RF-&): <br />Pass/Fail Threshold or <br />Criteria: <br />"o Loss IV, eS <br />to ® x-055 k A, ?0T <br />r', 4 Lw55 %0, P5 _I. <br />Test Result: <br />XPass ❑ Fail <br />Pass ❑ Fail <br />ass ❑Fail ❑Pass ❑ Fai <br />Comments — include information on repairs made <br />prior to testing, and recommended follow -u for failed tests <br />`^'� C 2.- do <br />`—T; f'" " p m H S <br />e_ e a d Q V <br />'' 0 e q Q <br />