Laserfiche WebLink
SWRCB, January 2002 <br />Page q of <br />Test Method Developed By: <br />avS6 AiJV111e\F <br />❑ Sump Manufacturer ❑ Industry Standard ofessional Engineer <br />S(J <br />❑ Other (Spec) <br />Portion of Sump Tested' <br />Test Method Used: <br />❑ Pressure <br />❑ Vacuum <br />ydrostatic <br />❑ Other (Spec) <br />Test Equipment Used Cu t c�.ujtt t d✓ C iticcc.� <br />v� 0 c c.. �4 v� <br />Equipment Resolution D p <br />2 ggSei krrra v <br />v p4f$ i• Y} <br />�SbtA�� <br />#,._ aSump <br />J Sump # <br />Sump <br /># Sump # <br />\ <br />Turbine shutdown response time <br />Sump Diameter: <br />Z <br />N o -�P -��, <br />L12 <br />f2, r, <br />Sump Depth: <br />shutdown?` <br />1' <br />es ❑ No ❑ NA <br />Sum <br />Sump Material: <br />Ft �� l��s <br />Was fail-safe verified to be <br />Fs ��- �5; 5 <br />lis <br />Height from Tank Top to Top of <br />? <br />OP eratYo <br />❑ Yes _CNo ❑ NA <br />s <br />❑ Yes pqNo ❑ NA <br />❑ Yes ! No ❑ NA <br />Hi est Piping Penetration: <br />pressure/vacu water d starting <br />Height from Tank Top to Lowest <br />test. <br />1pI__- <br />Electrical Penetration: <br />161',,- <br />T <br />Test Start Time: <br />!; o o <br />t S-0 <br />Initial Reading (R): <br />rr VS 4— C'VC (Q 4- C'Foc <br />uvaa v1 auulr F1 1%J1 w LVNLLU6. <br />�,/ r_1 <br />S(J <br />D r <br />Portion of Sump Tested' <br />t¢,v.e. _ Z? <br />r <br />f <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />?` <br />Yes ❑ No ❑ NA <br />(� <br />'Yes ❑ No ❑ NA <br />es ❑ No ❑ Np <br />❑ Y ❑ No ❑ NA <br />pKLduct and water <br />\ <br />Turbine shutdown response time <br />Nd G c 10'k <br />6W C lei A <br />N o -�P -��, <br />i <br />Is system programmed for fail-safe <br />shutdown?` <br />es ` ❑ No ❑ NA <br />es ❑ No ❑ NA <br />❑ No ❑ NA <br />❑ Yes 1P No ❑ NA <br />Was fail-safe verified to be <br />? <br />OP eratYo <br />❑ Yes _CNo ❑ NA <br />❑ Yes ❑ NA <br />❑ Yes pqNo ❑ NA <br />❑ Yes ! No ❑ NA <br />Wait time between_app lying <br />pressure/vacu water d starting <br />test. <br />1pI__- <br />® <br />161',,- <br />T <br />Test Start Time: <br />!; o o <br />t S-0 <br />Initial Reading (R): <br />rr VS 4— C'VC (Q 4- C'Foc <br />Test End Time: <br />3o <br />t 2 <br />t <br />Final Reading (RF): <br />_61 S <br />Test Duration: <br />0 r, T �°� , ®i' -t >�i c� <br />3 <br />Change in Reading (RF-RO: <br />N o C. L, L Q tJ G C <br />Pass/FaiI Threshold or Criteria: <br />®� g,� a „' s e rr • <br />f ,.x" : ; a r va , <br />Test Result: <br />Pass ❑ Fail <br />Pass p Fail <br />Pass 0 Fail <br />4 Pass Fail <br />Was sensor removed for testing?es <br />❑ No ❑ NA i des ❑ No ❑ NA <br />es ❑ No ❑ NA <br />❑ Yes ❑ No NA <br />Was sensor properly replaced and <br />verified functional after testin ? <br />.., es ❑ No ❑ NA Yes ❑ No ❑ NA <br />,'(Yes ❑ No [INA `❑ Yes ❑ No NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to my of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />