Laserfiche WebLink
Alonk -ring System Certification <br />II 1 <br />Lori= <br />VS.= On= <br />Is the audible alarm operational? <br />rM Were all sensors visually inspected, functionally tested, and confirmed operational? <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment <br />will not interfere with their proper operation? <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g., modem) <br />operational? <br />For pressurized piping systems, does the turbuie automatically shut down if the piping secondary containment <br />monitoring system detects a leak, fails to operate, or is electricaW disconnected? If yes: which sensors initiate <br />positive shut -down? (Check all that apply) 0 Sump/Trench Sensors; 0 Dispenser Containment Sensors. <br />Did you confirin positive shut -down due to leaks and sensor failure/disconnection? 0 Yes; 0 No. <br />rmv=, For tank systems that utilize the monitoring system as the primary tank overfill warning device Fie-, no7 <br />mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank:: <br />fill point(s) and operating properly? If so, at what percent of tank capacity does the alarm trigger? 90% <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment <br />replaced and list the manufacturer name and model for all replacement parts in Section E, below. <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br />0 Product; 0 Water. If yes, describe causes in Section E, below. <br />�-Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br />��: <br />-Is all monitoring equipment operational per manufacturer's specifications? <br />* In Section E below, describe how and when the deficiencies were or will be corrected. <br />E. Comments: <br />