Laserfiche WebLink
',.,Mbjmftaring System Certification Is <br />jlI,Lj3rIIIII#]IIL= <br />AMM V_M <br />Complete the following checklist: <br />E <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />0 <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />FFWere all tank gauging probes visually inspected for damage and residue buildup? <br />=r <br />#Were <br />Was accuracy of system product level readings tested? <br />rrolmrliml <br />Was accuracy of system water level readings tested? <br />NO= <br />Were all probes reinstalled properly? <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />ffWCIMLrM= <br />0 <br />I - <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />(Check all that apply) Simulated leak rate: 0 3 g.p.h.; 0 0. 1 g.p.h; [10.2 g.p.h. <br />Iii <br />#Were <br />all LLDs confirmed operational and accurate within regulatory requirements? <br />Was the testing apparatus properly calibrated? <br />NO= <br />For mechanical LL]Ps, does the LL* restrict product flow if it detects a leak? <br />i <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />NIAM 110,01 <br />1. <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />ffWCIMLrM= <br />