My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1612
>
2300 - Underground Storage Tank Program
>
PR0231127
>
COMPLIANCE INFO_2002-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 1:48:44 PM
Creation date
6/23/2020 6:44:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2009
RECORD_ID
PR0231127
PE
2361
FACILITY_ID
FA0003611
FACILITY_NAME
PARKWOODS GAS & FOOD
STREET_NUMBER
1612
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728002
CURRENT_STATUS
01
SITE_LOCATION
1612 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231127_1612 W HAMMER_2002-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
',.,Mbjmftaring System Certification Is <br />jlI,Lj3rIIIII#]IIL= <br />AMM V_M <br />Complete the following checklist: <br />E <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />0 <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />FFWere all tank gauging probes visually inspected for damage and residue buildup? <br />=r <br />#Were <br />Was accuracy of system product level readings tested? <br />rrolmrliml <br />Was accuracy of system water level readings tested? <br />NO= <br />Were all probes reinstalled properly? <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />ffWCIMLrM= <br />0 <br />I - <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />(Check all that apply) Simulated leak rate: 0 3 g.p.h.; 0 0. 1 g.p.h; [10.2 g.p.h. <br />Iii <br />#Were <br />all LLDs confirmed operational and accurate within regulatory requirements? <br />Was the testing apparatus properly calibrated? <br />NO= <br />For mechanical LL]Ps, does the LL* restrict product flow if it detects a leak? <br />i <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />NIAM 110,01 <br />1. <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />ffWCIMLrM= <br />
The URL can be used to link to this page
Your browser does not support the video tag.