My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1612
>
2300 - Underground Storage Tank Program
>
PR0231127
>
COMPLIANCE INFO_2002-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 1:48:44 PM
Creation date
6/23/2020 6:44:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2009
RECORD_ID
PR0231127
PE
2361
FACILITY_ID
FA0003611
FACILITY_NAME
PARKWOODS GAS & FOOD
STREET_NUMBER
1612
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728002
CURRENT_STATUS
01
SITE_LOCATION
1612 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231127_1612 W HAMMER_2002-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FROM FAX NO. <br />SWRCH, Jaim.ry 2002 <br />0 Jan. 10 2003 11:25AM P4 <br />2;�C, I/A e—o Y it <br />Page — of —. <br />Test Method Developed By: <br />C, Piping Manufacturer 0 Industry Standard LE Profenional Envneer <br />C Other (S, wqfy) <br />Test Method Used, <br />a Pressure <br />0 Vacuum <br />0 Hydrostatic <br />El Other (Specify) <br />Test Equipment Used: -9-CAITE-1 <br />Equipment Resolution: <br />Piping Ron # <br />Piping Run # 2r <br />j�jn Run # JI ronst Run <br />Piping Material; <br />1716ejrodct <br />P, ler%lea <br />k5 I <br />-Pipirg DWneW: <br />'311 <br />ungth of Piping Run: <br />J2, 0 <br />12 o— <br />Product S <br />' Stored: <br />e -A v <br />Sober <br />Method and location of <br />pipina-run isolation: <br />7es+.. boo <br />77 131 <br />T" L3 <br />Wait time between applying <br />pressure/vacuum/wmer and <br />starting test: <br />Test Stan Time: <br />0 <br />.30 <br />Initial Reading (R): <br />Kf.P, <br />S'- P <br />Test End Time: <br />Ficial Reading <br />.�- P, <br />Tog Duration: <br />Change in Reading (RF-&): <br />Pass/Fail Threshold or <br />Criteria: <br />
The URL can be used to link to this page
Your browser does not support the video tag.