Laserfiche WebLink
• <br />FROM FAX NO. Jan. 10 2003 11:25AM P5 <br />J0 <br />PIPING SUMP CONIAINMENT I'ESTING <br />Te,.,,,t Method By: () Manut4cturer <br />Test Method Used: 0 Pressure <br />MeasUring equipment used; Level Indi4atOT; <br />Desmiption <br />'rank 4 1 <br />4b Industry standard <br />0 Vacuum <br />f / Caldwell system 2001, <br />Tank -#2— ' <br />0 Prof. Engr. 0 Other <br />a I lydrostatic 0 Other <br />F=k <br />Sump rnater—iaf- <br />Sump Diameter <br />Sump Depth <br />-P <br />�leigbT trom tank top <br />to est piping <br />Height from rank Fop <br />T <br />'" <br />1 <br />o <br />t lowest <br />i <br />All <br />Condition of sump <br />fir, <br />Portion of sump tested <br />Is "em programmed for <br />fail safe? <br />Was fail safe vc�n�W� <br />... ... .... <br />... .......... <br />-TY <br />Was sensor removed? <br />ye's <br />Y <br />.. <br />Was sensor replaced? <br />......... <br />Y <br />tied/' <br />Wait time for water level <br />to stabilize. min <br />Depth of water level <br />from taz k top <br />-''!'gest-s �r tine <br />.... ............ 57, <br />-0 <br />Test duration M 10 <br />Change in water level +- inches <br />PassfFail threshold (O.WS inches <br />2,4 <br />TEST RESULTS <br />Comments: <br />t <br />L <br />t <br />