Laserfiche WebLink
M <br />Auto is line leak detectors will.be installed on press ed piping <br />Manufacturer: Model: <br />Annual monitoring will be conducted on the pressurized piping with secondary containment. <br />Annual line tightness test will not be required if the continuous monitor shuts down the pump and <br />activates the alarm system when a release is detected and when the continuous monitoring <br />system fails or is disconnected. <br />20. State Water Resources Control Board "Facility (A)" and 'Tank Permit (B)" application forms submitted. <br />21. Plan review and operating permit fees paid. <br />22. What is the approximate depth to ground water: <br />(include source of information - borehole logs, monitoring well data, water <br />studies, etc.) : <br />23. Total number of tanks on site after installation: 3 2 Lt T <br />24. County/City Fire District and Building Department notified. <br />25. In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br />responsibility [in accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action Requirements] <br />as an owner -or operator to submit a workplan to EHD Site Mitigation Unit prior to initiating any assessment or <br />remediation activities. For further assistance contact the Site Mitigation Unit at (209) 469-3450. <br />The owner or operator must acknowledge this responsibility for workplan submittal by signature and date below. <br />NameTitle Date <br />r tit <br />CONDITIONS OF APPROVAL: <br />W <br />