Laserfiche WebLink
UST SYSTEM DRAWING INFORMATION <br />Three complete sets of plans (include manufacturer's specification sheets for proposed equipment to be installed). <br />✓ Plans drawn to scale in non -erasable print. <br />_✓ Plot plan to show location of tanks and att associated piping. <br />V Striker plates or drop tube -mounted bottom protectors illustrated below all accessible openings. <br />®✓ Tank cross-sectional diagram. <br />✓ Detail of tank, associated piping, excavation and cover. <br />Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Chapter 16, <br />Article 3, Section 2631 (b) & 26351 <br />Verification of product compatibility with the tank(s), piping, monitoring <br />device(s), epoxy or silicone glues, etc. <br />Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br />At the installation site, prior to installation, a tightness test shalt be performed on both primary (10) and <br />secondary (2°) containment systems before covering. [Section 2635 (a) (3) & (4)] <br />Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br />suanitted directly to PHS-EHD from the testing company or owner of facility. [Health & Safety Code, Division 20, <br />Chapter 6.7, Section 25291 (h)] <br />TAYY (_TAPMTTTnY <br />TANK ;t <br />A <br />'!5,000 <br />CAPACITY <br />112,000 <br />I 12_,00' <br />r,J- ncoc:) <br />MANUFACTURER <br />COMPOSITION <br />Sri-' <br />MODEL <br />PRODUCT <br />UNL.'!PPV. <br />CORROSION PROTECTION <br />U.L. LISTED <br />y S <br />COMPATIBILITY WITH 100X <br />METHANOL <br />13. TANK(s) TO BE INSTALLEDjCl�1 ING� e — " <br />A. Steet-clad with fiberglass reinforced plastic coatings, composites, or equivalent. non-metallic exterior <br />coatings or coverings. <br />(1) Tested at the installation site using an electric resistance holiday detector. <br />(2) Vacuum applied to interstitial space. <br />3. Fiberglass <br />(1) Installation instructions require an air test and soap bubble test prior to installation. <br />(2) Vacuum applied to interstitial space. <br />(3) Hydrostatic annular (primary tank pressure test). <br />C. Non -clad steel tank [Section 2635 (a) (2) (A)] <br />(1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br />etc.). <br />(2) Field installed cathodic protection systems designed and certified as adequate by a <br />corrosion specialist. <br />(3) Immpressed current systems to be inspected no less than every 60 days. <br />9 <br />