Laserfiche WebLink
D• Alternate consto on for new underground storage tanks cont*g motor vehicles fuel (Section 2633]. <br />(1) Monitoring and response plan CSection 26341. <br />(2) Underground storage tank composed of.... <br />_. (a) Fiberglass reinforced plastic. <br />— (b) Cathodicalty protected steel. <br />(c) Steel clad with fiberglass reinforced plastic. <br />(d) Other material that complies with section 2631 and 2632. <br />(3) Floor of leak interception and detection system constructed on a firm base and sloped to a <br />collection sump (use of membrane liners comply with section 2631 (d) (6) requirements.) <br />_. (4) Access casings installed in the collection sump of the secondary containment system with <br />backfill in the interstitial space. The access casing shalt meet all of the following: <br />Designed and installed to allow the Liquid to flow into the casing. <br />Sized to allow removal of collected liquid and able to withstand all anticipated applied <br />stresses. <br />Constructed of material that will not be structurally weakened. <br />Screened along entire vertical zone of permeable material. <br />Capable of preventing leakage of any hazardous substance from the casing. <br />Extend to the ground surface and covered with a locked waterproof cap. <br />Capable of meeting S.J. Co. PHS-EHD Welt Standards. <br />Leak interception and detection system shalt prevent the leaked hazardous substance from <br />entering ground water. <br />14. INTERSTITIAL SPACE MONITORING <br />A. Visual monitoring [Section 2632 (c) (1)] <br />e (a) Exterior surface and floor beneath tank monitored by direct viewing <br />(b) DaiLy visual inspections <br />(c) Liquid Level in tank to be recorded at time of inspection <br />(d) If liquid observed around or beneath primary tank, owner will determine if an unauthorized release <br />has occurred. <br />B. Mecnanical or electronic monitoring [Section 2632 (c) (2)] <br />_ āœ“ (a) Continuous monitoring system connected to an audible and visual alarm system. <br />Monitoring equipment to be installed <br />Manufacturer: v= <br />āœ“ Model Number: <br />Sensor Type: Vapor VLiquid _ Both. <br />Sensor/Panel specifications. <br />Location(s) for sensors: <br />Tank: Piping: SVM <br />Dispenser: <br />C. Monitoring and response plan submitted [Section 2632 (d) (1) & (2)]. <br />15. Any special accessories, fittings, coatings, or linings not inherent within the initial design of the 10 tank or <br />double -watt UST. [Section 2631 (b)] <br />_. A. Approved by a nationally recognized independent testing organization. <br />B. Demonstration of integrity with the primary and/or secondary containment. <br />n <br />