My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
642
>
2300 - Underground Storage Tank Program
>
PR0231148
>
COMPLIANCE INFO_1985-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2021 4:42:26 PM
Creation date
6/23/2020 6:44:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-2003
RECORD_ID
PR0231148
PE
2361
FACILITY_ID
FA0000799
FACILITY_NAME
STOCKTON MOBIL #1
STREET_NUMBER
642
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13906035
CURRENT_STATUS
01
SITE_LOCATION
642 N HUNTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231148_642 N HUNTER_1985-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
396
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEIBOLD CORPORATION <br />P.O. BOX 728 • STOCKTO, CA 95201 . 209-948-2152 <br />I� <br />Chevron U.S.A. <br />139 S. Center St. JUN 04 1990 <br />Stockton, CA. 95201 <br />r-NVi HEALTH <br />PERMIT/SERVICES <br />OVERFILL PROTECTION SYSTEM AL FOR FILL PROCEDURE <br />Prior to delivery of fuel's, a visual monitoring of the liquid level of the <br />tank to be filled shall be performed. <br />The station operator shall control the visual monitoring and filling of the <br />tanks. <br />the tank filled shall have an available capacity of 103% of the load to be <br />dropped into it or the total load plus 200 gallon capacity, whichever is less, <br />as determined by storage tank visual monitoring. <br />The load to be dropped into the underground tank shall be monitored either <br />offsite by the batch plant into the truck or onsite via a meter on the truck <br />into the underground tank. <br />Signature: Operator <br />
The URL can be used to link to this page
Your browser does not support the video tag.