Laserfiche WebLink
SWRCB,January 2002 Page :3 of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: tor <br /> g Manufacturer 0 Industry Standard 0 Professional Engineer <br /> D (Sped) <br /> Test Method Used: essure 0 Vacuum 0 Hydrostatic <br /> /❑Other(Sped) <br /> Test Equipment Used: Y,eSSu✓,Q �, Q s�.� QST N d�vu rn Equipment Resolution: 1 v — t y ► S--I-- <br /> OEM BEEM <br /> Piping Run#I Piping Run#2 Piping Run# Piping Run# <br /> Piping Material: l6t, e..S I Fi 6e vi—IA S.J Li —l-45 , <br /> Piping Manufacturer: t-- <br /> Piping Diameter: c r 3 r f (( X 3 t I t r <br /> Length of Piping Run: AVPy0y, I�U1kpwow. 17 O 1 y . 9-00 t Yet• S 01 <br /> Product Stored: .Per r,,f o r a§d f,�,a 1 e 5P-L. <br /> Method and location of ef <br /> i in -run isolation: Ui)e 0-1 // tAOc" g1// a D <br /> e between applying <br /> ressure/ cuum/water and <br /> s test: t 1ti a u to uy V,V1, o+� <br /> Test Start Time: so 3 <br /> Initial Reading(RD: 19 /'S /75--1- 19 57 '�? <br /> Test End Time: j 0 3 v L O ® = 3 4 (D <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-R�: 195 T7 <br /> Pass/Fail Threshold or <br /> Criteria: o L4%r" 1?S 9- 0010 5 '. mg Z0,55 w Y5. 'O �5 �S <br /> Test Resuilt; Russ Cl:)Fail Pass k"ayi Pass. 0 Fail ass tl:Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />