My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
642
>
2300 - Underground Storage Tank Program
>
PR0231148
>
COMPLIANCE INFO_2004-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2021 2:12:29 PM
Creation date
6/23/2020 6:44:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2008
RECORD_ID
PR0231148
PE
2361
FACILITY_ID
FA0000799
FACILITY_NAME
STOCKTON MOBIL #1
STREET_NUMBER
642
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13906035
CURRENT_STATUS
01
SITE_LOCATION
642 N HUNTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231148_642 N HUNTER_2004-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
361
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB January 2002 Page�of <br /> 5. SECONDARYPI E TESTING <br /> Test Method Developed By: iping Manufacturer 0 Industry Standard ❑Professional Engineer <br /> ❑ er(Spec) <br /> Test Method Used: ?tressure 619W' ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: ftk/,QqL`K P Ste- nl(�-ry V4 Equipment Resolution: 19S, . <br /> Piping Run# Piping Run# Wiping Run# Piping Run# <br /> Piping Material: <br /> Piping Manufacturer: S � a <br /> Piping Diameter: t ! t <br /> Length of Piping Run: D VOX, 75 5 <br /> Product Stored: Ne-aLA,0M{— <br /> Method and location of Cs�-boar 2 <br /> i in -run isolation: , i Su. y <br /> WaiLtime between applying <br /> ressure/v uum/water and <br /> s test: k o I& V,- <br /> Test <br /> Test Start Time: . : 3 <br /> Initial Reading(R4): 5-T <br /> Test End Time: [ D", �s <br /> Final Reading(RF): 5 ( 5-T, <br /> Test Duration: I&p V, <br /> Change in Reading(RF--R�: P 5 <br /> Pass/Fail Threshold or <br /> Criteria: tj o LOS S t PS.r. <br /> Test Results ass O.Fail. Pass ❑Fnil ❑ Pass ❑Fa ❑ Pass ❑Falk <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> �,I <br />
The URL can be used to link to this page
Your browser does not support the video tag.