Laserfiche WebLink
SWRCB,January 2002 Page 5 of <br /> 6. PIPMG SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure - ❑Vacuum drostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Cot t� ,e l l L_P_u..o_C,C, ,��` C e, / Equipment Resolution: O uz S- <br /> EM <br /> Sump# Sump# Z Sump# 3 Sump# L <br /> Sump Diameter: 4111 Q1,1t Z I' ttq-« <br /> Sump Depth: w 1 W7 t 12 .1 ^2 r .145 It <br /> Sump Material: e5►S.S �S 02k GS S i t r 4y r <br /> Height from Tank Top to Top of <br /> e� ® <br /> Highest Piping Penetration: (�I� 3 <br /> 11 71 <br /> Height from Tank Top to Lowest ® Q r � <br /> Electrical Penetration: ! I L11 <br /> Condition of sump prior to testing: q ,rf <br /> Portion of Sump Tested' Weje.-L..N . 22,-" We, -e,,Lint Z3 ► cc+-er w tfe✓t,.;."( qg <br /> Does turbine shut down when <br /> sump sensor detects liquid(both SYes ❑No ❑NA IYes ❑No ❑NA es ❑No ❑NA es ❑No ❑NA <br /> roduct and water)?* <br /> /\\ <br /> Turbine shutdown response time OCA--a"t(CAa. m 4,%- 4Au ijd+ ..e( 6Jt) .. ...ic <br /> Is system programmed for fail-safeRt <br /> shutdown? es ❑No ❑NA es ❑No ❑NA es ❑No ❑NA Yes ❑No ❑NA <br /> Was fail-safe verified to be ❑yes No ❑NA ❑Yes o ❑NA ❑Yes o ❑NA ❑Yes o ❑NA <br /> o eonal?°rati <br /> Wait time betwee g <br /> pressure/vacumater d startingg <br /> test: 16 r4 q&M A-5 -rS 16 M,pw - <br /> Test <br /> Start Time: 1; -15 v 3 v '51: 06 <br /> Initial Reading(R): v5 e.(k r-ir5-{ GM(e Lrv5-� 6NC Fr 1.5 61-e- <br /> Test End Time: 10 ; if 11-- 00 h: v v 12—, /S- <br /> Final Reading(RF): rfl-54- C4�.-Ct_e ,rv,-� .& v Cry 40 <br /> Test Duration: 3A r-d rn t r-^ n,-t-E--eS ,t 1 r �-eS 30 <br /> Change in Reading(RF-Ri): N o Q 1j 0 cl,c ar #►0 <br /> Pass/Fail Threshold or Criteria: `o D S t Cv� oo> 3o m�- <br /> Test Result: V Pass ❑Fail ass ❑Fail ass 0 Fail VPass ❑Fail <br /> Was sensor removed for testing? AoYes ❑No ❑NA Oes ❑No ❑NA es ❑No ❑NA es ❑No ❑NA <br /> Was sensor properly replaced and yes ❑No ❑NA es ❑No ❑NA ,ZYes ❑No ❑NAes ❑No ❑NA <br /> verified functional alter testing? <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 1 If the entire depth of the sump is not tested,specify how much was tested. If the answer to ly of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />