Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - LaLe I of 2) <br />TYPE OF ACTION ❑ 1. NEW PLAN F12. CHANGE OF INFORMATION <br />490-1 <br />PLAN TYPE 1. MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br />490.2 <br />(Check one item only) ❑ 2. THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S)- <br />L FACILITY INFO TION .: <br />FACILITY ID # (Agency Use Only) - - ® <br />1 <br />BUSINESS NAME (Same as FACILITY NAME) C A A)C-P-T P, IBJ A &II <br />3 <br />BUSINESS SITE ADDRESS l}.Z N , �}-( (s 103' <br />CITY j ---f ® -� <br />lox. <br />II. EQUIPMENT TESTING AND PREVE .: , .. MANCE <br />Testing, preventive maintenance, and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc.) must be performed at the frequency <br />specified by the equipment manufacturers' instructions, or annually, whichever is more frequent, and that such work must be performed by qualified personnel. <br />23 CCR 2632 2634, 2638, 2641 <br />MONITORING EQUIPMENT IS SERVICED 1. ANNUALLY El99.OTHER (Specify): <br />4�3b <br />M. MONITORING.;OCATIONS <br />❑ 1. NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. ❑ 2. SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR §2632, <br />2634)490-4 <br />TV. TANK MONITORING IS PERFO D iJSING'I H]E FOLI:UWING M1 THODM <br />I. CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT <br />490-5 <br />VAULT(S) WITH AUDIBLE AND VISUAL ALARMS. (23 CCR §2632,2634) <br />SECONDARY CONTAINMENT IS: A a. DRY ❑ b. LIQUID FILLED ❑ c. PRESSURIZED ❑ d. UNDER VACUUM <br />490.6 <br />41. <br />PANEL MANUFACTURER y <br />MODEL #: 570 <br />490.8 <br />LEAK SENSOR MANUFACTURER: 41 <br />MODEL #(S): 20 <br />490-10 <br />❑ 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANK(S). (23 CCR §2643) <br />490-11 <br />PANEL MANUFACTURER 490-12' MODEL #: <br />490-13 <br />IN -TANK PROBE MANUFACTURER: 49x14' MODEL #(S): <br />490-15 <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS ❑ b. DAILY/NIGHTLY ❑ c. WEEKLY <br />490-16 <br />❑ d. MONTHLY ❑ e. OTHER (Specify): <br />490-17 <br />PROGRAMMED TESTS: ❑ a. 0.1 g.p.h. ❑ b. 0.2 g.p.h. ❑ c. OTHER (Specify): <br />490.16 <br />490.19 <br />❑ 3. MONTHLY STATISTICAL INVENTORY RECONCILIATION (23 CCR §2646.1): <br />490.20 <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MIG) (23 CCR §2645). TESTING PERIOD: E]a. 36 HOURS ❑ b. 60 HOURS <br />490.zi <br />5. TANK INTEGRITY TESTING (23 CCR §2643.1): <br />490-23 <br />090-24 <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. BIENNIALLY ❑ c. OTHER (Specify): <br />490-25 <br />❑ 99. OTHER (Specify): <br />490-26 <br />490-27 <br />V..PIPE MONITORING is' PERFORMED USING FOLLOWING N ETHOD(S) (Check aIi 00*001y) <br />CONTINUOUS MONITORING OF PIPE! PIPING SUMP(S) AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND <br />490-29 <br />ISUAL ALARMS. (23 CCR §2636) <br />SECONDARY CONTAINMENT IS: jOa. DRY ❑b. LIQUID FILLED ❑c. PRESSURIZED ❑d. UNDER VACUUM <br />490-29 <br />490.3° <br />PANEL MANUFACTURER., <br />MODEL #: 'rLS <br />490-31 <br />LEAK SENSOR MANUFACTURER y 49° 32 MODEL #(S): Z ® <br />490-33 <br />PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN. ❑ a. YES ❑ b. NO <br />0-90-30- <br />FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ❑ b. NO <br />490-35 <br />2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g pJL LEAK TESTS AND RESTRICTS OR SHUTS OFF <br />PRODUCT FLOW WHEN A LEAK IS DETECTED 23 CCR 263 <br />490-36 <br />MLLD MANUFACTURER(S): 490-37 MODEL #(S): <br />438 <br />3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p h. LEAK TESTS (23 CCR §2636) <br />490-39 <br />ELLD MANUFACTURER(S) %I e-9) f5 4 40' I MODEL #(S): R Lf gqgo -001 <br />490-0-1 <br />PROGRAMMED IN LINE LEAK TEST: ❑ 1. MINIMUM MONTHLY 0.2 g.p.h. ❑ 2. MINIMUM ANNUAL 0.1 g.p.h. <br />49042 <br />ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ❑ b. NO <br />490.43 <br />ELLD FAILURE/DISCONNECfION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a YES ❑ b. NO <br />490-44 <br />❑ 4. PIPE INTEGRITY TESTING 49o -4s <br />TEST FREQUENCY Q a. ANNUALLY Q. b. EVERY 3 YEARS Q c. OTHERS i 49046 490.47 <br />5. VISUAL PIPE MONITORING. <br />490-48 <br />FREQUENCY ❑ a. DAILY ❑ b. WEEKLY ❑ C. MIN. MONTHLY & EACH TIME SYSTEM OPERATED* <br />490.49 <br />• Allowed for nxndtoring of unburied enawor rud piping ordy per HSC 25281.5 3 <br />❑ 6. SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR §2636(ax3)1. <br />490-50 <br />7. NO REGULATED PIPING PER HEALTH AND SAFETY CODE, DIVISION 20, CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br />49°-51 <br />490.52 <br />❑ 99. OTHER (Specify) <br />490 53 <br />UPCF UST -D (12/2007)1/4 <br />