Laserfiche WebLink
19. Piping (cross-sectional dilem, including connections to tank and dispeo). <br /> (A) Vent and tank riser primary containment system equipped with overfill prevention system that: <br /> Restricts delivery of flow to tank [Section 2635 (b) (2) (B) or (C)], or <br /> T Provide positive shut off of flow to the tank at no more than 95 % [Section 2635 (b)(2)(C)3, or <br /> (B) ✓ Vapor recovery piping designed so it cannot contain liquid phase product, or <br /> (C) Suction piping (below grade piping operates at less than atmospheric pressure) (Section 2636 (a) (3)] <br /> Sloped so contents of the pipe will drain back into the storage tank if the suction is <br /> released. <br /> No valves or pumps installed below grade. <br /> inspection method provided to demonstrate compliance with section 2636 (a) (3). <br /> (D) Corrodible underground piping protected against corrosion (Section 2636 (b)). <br /> (E) Underground primary piping will meet all of the following requirements / <br /> I/ Primary piping in contact with hazardous substance under normal op�Fation conditions shalt be: <br /> installed inside a secondary containment system in the form of: ✓secondary pipe_Vault or <br /> _lined trench to be sloped to a collection sump at the low point of the piping. <br /> Primary piping and secondary containment systems will be installed in accordance with industry <br /> code of practice and voluntary consensus standards.. <br /> (/J _ Lined trench used as secondary containment <br /> Material compatible with the substance stored. <br /> Covered and capable of supporting any expected vehicular traffic. <br /> (F) Underground-piping with secondary containment will be equipped and monitored as follows: <br /> V Secondary containment will be equipped with a continuous monitoring system connected to an audible <br /> / and visual alarm system. <br /> ✓ Automatic lire leak detectors will be installed on pressurized piping <br /> '— Manufacturer: VPrP0(+-11-19cSS Model: LO 'LGbO <br /> / Annual monitoring will be conducted on the pressurized piping with secondary containment. <br /> I--," <br /> - Annual line tightness test will not be required if the continuous monitor shuts down the pump and <br /> activates the alarm system when a release is detected and when the continuous monitoring system <br /> fails or is disconnected. <br /> 20. / State Water Resources Control Board "Facility (A)" and "Tank Permit (B)" application forms submitted. <br /> 21. ✓ Plan review and operating permit fees paid. <br /> 22. ✓ What is the approximate depth to ground water: <br /> 3 ) <br /> (include source of information - borehole logs, monitoring well data, water <br /> studies, etc.) 1 / L <br /> S4/) Sog g&/N CV. /n ac4- D� //�fi�1%L WO/'� F�dn� �0�17/0/ S!C41 <br /> 23. Total number of tanks on site after installation: (J <br /> 24. ✓ County/City Fire District and Building Department notified. 1 (� <br /> 25. 1Z In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br /> responsi ity Cin accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br /> Require nt ] as an owner or operator to submit a workplan to PHS-EHD Site Mitigation Unit prior to initiating any <br /> assessor nt r remediation activities. For further assistance contact the Site Mitigation Unit at (209) 469-3450. <br /> Te own o o e for must acknowledge this responsibility for workplan submittal by signature and date below. <br /> Name 1 PrIL-tom Y -.Ti t t e h-R-Gk- - 0"1- MCh 0-. Date O <br /> CONDITIONS OF APPROVAL: <br />