Laserfiche WebLink
07107/2008 02:56 9163731173 WALTONENGINEERING PAGE 04 <br /> e is <br /> 13. Using the 61 SA-TOOL,tighten the spill 19. Apply an even bead of PISCES SLA 100 around <br /> container(s)onto the riser(s)with a minimum the 5116"hex bolts after final tightening, <br /> torque of 125 ftAbs, and a maximum torque of 20. Install the spill bucket covers. (See Figure 6.) <br /> 250 ft.-lbs. <br /> 14. The bolt holes in the multi-port cover must line 21' on h°e spill bucket cover and multi-port cover sin <br /> up with the bolt holes in the containment bucket P <br /> mounting ring. the I.D.disc recess. <br /> 15. Maintenance or as needed:Apply an even bead 22. Cover the multi-port perimeter ring and cover <br /> of PISCES SL-1100 onto the bottom of the with plastic to prevent concrete from settling in <br /> mounting ring before assembling the the drainage areas. <br /> containment bucket mounting ring and the 23. It is required that the perimeter ring and skirt <br /> mounting ring onto the multi-port cover. (See assembly, and the multi-port cover be set as an <br /> Figure 5.) assembled unit, with the bolts engaged. Failure <br /> to engage the bolts may result in the distor6on of <br /> Bolt Beveled washer the ring and improper fit of the ring to cover after <br /> evel Facing Down) the concrete is poured. <br /> �. 24, When pouring the concrete, hand shovel or <br /> Nlounting'}tizag i read Seal washer <br /> trowel the concrete around the multi-port <br /> ISCES SL-1100 assembly to prevent the unit from moving or <br /> shifting,which can cause alignment problems <br /> % and future maintenance problems. <br /> containment BucketNote- Do not stand on the multi-port before the <br /> Y Mounting Ring concrete has set up. <br /> 25. It is recommended that the paved contours <br /> around POMECO covers be adequately sloped <br /> to direct water flow away from the cover,and <br /> Figure 6 directing water runoff from adjacent areas away <br /> from POMECO covers. (See Figure 7.) <br /> 16. Install the beveled thread seal flat washer and <br /> the thread seal washer onto the bolts for the <br /> mounting ring. (See Figure 5.) „ r <br /> Note: Install the beveled thread seal flat washer <br /> on the bolt with the beveled surface away from <br /> the bolt head. Install the thread seal washer to <br /> seat between the flat washer and the mounting <br /> ring. <br /> 17. Apply PISCES SL-1100 to each bolt prior to <br /> inserting them into the mounting ring. _ <br /> 18. Tighten the mounting ring retaining bolts until <br /> the containment bucket gasket makes contact Figure 7 <br /> with the multi-port cover. Then, in a crossing <br /> pattern, torque the bolts down between 15 to 20 <br /> ftAbs. 26. Remove the plastic after the concrete has set <br /> up. <br /> 27. After installation is complete,water test the <br /> multi-port fixture. The recommended water test <br /> 0 procedures include: <br /> a) Spraying water on cover(s)for 5 to 10 <br /> minutes, using a commonly available <br /> watering device such as a lawn sprinkler. <br /> _ b) Standing water test, not to exceed'/” in <br /> water depth for a period of 5 to 10 minutes. <br /> Note: The containment bucket consists of three <br /> components steel top ring, bellows, and bucket <br /> bottom. These parts are held together with stainless <br /> steel retaining bands. <br /> Figure B <br /> Page 3 <br /> POMECO Multi port Spill Container <br />