My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2000-2008 DOUBLE CHECK
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
9321
>
2300 - Underground Storage Tank Program
>
PR0231261
>
COMPLIANCE INFO_2000-2008 DOUBLE CHECK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 1:50:45 PM
Creation date
6/23/2020 6:45:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000-2008 DOUBLE CHECK
RECORD_ID
PR0231261
PE
2361
FACILITY_ID
FA0002890
FACILITY_NAME
QUIK STOP MARKET #2120*
STREET_NUMBER
9321
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
STOCKTON
Zip
95209
APN
080-180-05
CURRENT_STATUS
01
SITE_LOCATION
9321 N THORNTON RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231261_9321 N THORNTON_2000-2008 DOUBLE CHECK.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
07107/2008 02:56 9163731173 WALTONENGINEERING PAGE 04 <br /> e is <br /> 13. Using the 61 SA-TOOL,tighten the spill 19. Apply an even bead of PISCES SLA 100 around <br /> container(s)onto the riser(s)with a minimum the 5116"hex bolts after final tightening, <br /> torque of 125 ftAbs, and a maximum torque of 20. Install the spill bucket covers. (See Figure 6.) <br /> 250 ft.-lbs. <br /> 14. The bolt holes in the multi-port cover must line 21' on h°e spill bucket cover and multi-port cover sin <br /> up with the bolt holes in the containment bucket P <br /> mounting ring. the I.D.disc recess. <br /> 15. Maintenance or as needed:Apply an even bead 22. Cover the multi-port perimeter ring and cover <br /> of PISCES SL-1100 onto the bottom of the with plastic to prevent concrete from settling in <br /> mounting ring before assembling the the drainage areas. <br /> containment bucket mounting ring and the 23. It is required that the perimeter ring and skirt <br /> mounting ring onto the multi-port cover. (See assembly, and the multi-port cover be set as an <br /> Figure 5.) assembled unit, with the bolts engaged. Failure <br /> to engage the bolts may result in the distor6on of <br /> Bolt Beveled washer the ring and improper fit of the ring to cover after <br /> evel Facing Down) the concrete is poured. <br /> �. 24, When pouring the concrete, hand shovel or <br /> Nlounting'}tizag i read Seal washer <br /> trowel the concrete around the multi-port <br /> ISCES SL-1100 assembly to prevent the unit from moving or <br /> shifting,which can cause alignment problems <br /> % and future maintenance problems. <br /> containment BucketNote- Do not stand on the multi-port before the <br /> Y Mounting Ring concrete has set up. <br /> 25. It is recommended that the paved contours <br /> around POMECO covers be adequately sloped <br /> to direct water flow away from the cover,and <br /> Figure 6 directing water runoff from adjacent areas away <br /> from POMECO covers. (See Figure 7.) <br /> 16. Install the beveled thread seal flat washer and <br /> the thread seal washer onto the bolts for the <br /> mounting ring. (See Figure 5.) „ r <br /> Note: Install the beveled thread seal flat washer <br /> on the bolt with the beveled surface away from <br /> the bolt head. Install the thread seal washer to <br /> seat between the flat washer and the mounting <br /> ring. <br /> 17. Apply PISCES SL-1100 to each bolt prior to <br /> inserting them into the mounting ring. _ <br /> 18. Tighten the mounting ring retaining bolts until <br /> the containment bucket gasket makes contact Figure 7 <br /> with the multi-port cover. Then, in a crossing <br /> pattern, torque the bolts down between 15 to 20 <br /> ftAbs. 26. Remove the plastic after the concrete has set <br /> up. <br /> 27. After installation is complete,water test the <br /> multi-port fixture. The recommended water test <br /> 0 procedures include: <br /> a) Spraying water on cover(s)for 5 to 10 <br /> minutes, using a commonly available <br /> watering device such as a lawn sprinkler. <br /> _ b) Standing water test, not to exceed'/” in <br /> water depth for a period of 5 to 10 minutes. <br /> Note: The containment bucket consists of three <br /> components steel top ring, bellows, and bucket <br /> bottom. These parts are held together with stainless <br /> steel retaining bands. <br /> Figure B <br /> Page 3 <br /> POMECO Multi port Spill Container <br />
The URL can be used to link to this page
Your browser does not support the video tag.