Laserfiche WebLink
07/07/2008 02_56 - 9163731173 WALTONENGINEERING PAGE 05 <br /> 1 <br /> DO NOT loosen the staff less steel re ai in ands Testing Spill Containers <br /> secuFn t e be lows o t e cont rnent bucket tv Use California Test Procedures, Their Test <br /> first or the containment bucket bottom. Lessening procedures will check the seals between the drain <br /> the retaining bands voids any and all warranties on valve, nipple and rotatable adapter. To test the spill <br /> this product, containers base and bellows fill the container with <br /> water. A drop in the water level of 1/16"or greater <br /> wa in . after one hour means that a leak exists. To <br /> /f a cover s re oved fo a rens® fo to determine where the leak is, look for a steady <br /> the Se 'ca an Mai ten ce ins c o as stream of bubbles coming from one of the joints or <br /> noted Alterays remove! e exist na aS ete and water leaking on the outside of the bucket. NOTE. <br /> install new vaskets� Never reuse t e old ®©not drain the water into the UST after the test is <br /> kets Reuse of askets a resWt in art complete, water must be disposed of per local <br /> imAropers2W- requirements for hazardous waste. if the leak <br /> cannot be corrected the spill container should be <br /> Operation and Maintenance:operator must replaced with another. <br /> After each fuel delivery,the op <br /> remove any standing fuel from the container. pOMSCO recommends periodic inspection of covers <br /> Fuel can be removed by actuating the drain and seals as a part of the regularly scheduled <br /> valve or with a gasoline absorbing disposable maintenance program. If any of the seals are <br /> towel. Annually: Inspect and clean the interior damage they should be replace. Only qualified, <br /> of the spill container and drain valve screen. competent,well-trained technicians should perform <br /> Remove accumulated dirk and grit. If the drain maintenance. <br /> valve screen becomes clogged, remove the (Vote: Common sense and good judgment should <br /> valve, soak in water and use high-pressure au derstandingalways berof all related s teTheractorconditions prior to <br /> clean. Reinstall the drain valve to its proper position contractoris essential. if the <br /> and test the valve per the appropriate California Test doedsnnot have ag the projeclear ndertandng of the required <br /> Procedure. If problems persist, replace the drain work and site conditions,the contractor is advised to <br /> valve with /N 1 -2100- (specified torque seek clarification prior to starting any portion of the <br /> 11.5 ft-lbs min to 13.5 ft-lbs max, 5/16-18 UN project. <br /> thread). The sealable cover(1 SC) adjustment <br /> nut is set at the factory, but due to <br /> environmental conditions it may be necessary <br /> to adjust it to either improve sealing or ease <br /> cover removal. <br /> Em�;rt�,L-estructions with Station <br /> quirements <br /> 'gop=101bi, 111111-011111& W <br /> P.O. Box 405003"Cincinnati,Ohio 45240-5003 <br /> 1-800-422-2525 Domestically <br /> 513-870.3315 Internationally <br /> Marketing Agent for POMECO by OPW, Inc. <br /> Copyright,2002-OPW Fueling Components Inc., Cincinnati, OH <br /> Printed in U.S.A. p/n H14976PA—09/02 <br /> POMECO Multi port Spill Container <br /> Page 4 <br />