My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2012 DOUBLE CHECK
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
9321
>
2300 - Underground Storage Tank Program
>
PR0231261
>
COMPLIANCE INFO_2009-2012 DOUBLE CHECK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 1:56:44 PM
Creation date
6/23/2020 6:45:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2012 DOUBLE CHECK
RECORD_ID
PR0231261
PE
2361
FACILITY_ID
FA0002890
FACILITY_NAME
QUIK STOP MARKET #2120*
STREET_NUMBER
9321
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
STOCKTON
Zip
95209
APN
080-180-05
CURRENT_STATUS
01
SITE_LOCATION
9321 N THORNTON RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231261_9321 N THORNTON_2009-2012 DOUBLE CHECK.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECONDARY LINE TESTING <br /> Test Method By: O Manufacturer • Industry Standard o Professional Engr o Other(see below) <br /> Test Method Uses: • Pressure o vacuum o Hydrostatic o Other(see below) <br /> Measuring Equipment Used: Pressure Gauge (range 0 to 15 psig) <br /> Description Line#1 Line#2 <br /> Tank product Gasoline-91 Gasoline-87 <br /> Pipe manufacturer Smith Smith <br /> Pipe material FRP FRP <br /> Primary pipe diameter (inches) 2 2 <br /> Secondary pipe diameter (inches) 3 3 <br /> Method of secondary pipe isolation Termination Boot Termination Boot <br /> Location of secondary pipe isolation Sump Sump <br /> Estimated length of piping run (feet) 45 55 <br /> (include length of branch runs) <br /> Wait time for pressure to stabilize (hr:min) 0:02 0:02 <br /> Test start time 9:37 10:16 <br /> Initial pressure (psig) 5.0 5.0 <br /> Test end time 10:37 AM 11:16 AM <br /> Final pressure(psig) 5.0 5.0 <br /> Test duration (hr:min) 1:00 1:00 <br /> Change in pressure (psig) 0.0 0.0 <br /> Pass/Fail threshold (psig) 0.5 0.5 <br /> TEST RESULT PASS PASS <br /> Comments: <br /> © 2012 Walton Engineering,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.