My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ACKERMAN
>
1725
>
2300 - Underground Storage Tank Program
>
PR0231309
>
COMPLIANCE INFO_2002-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2022 3:24:31 PM
Creation date
6/23/2020 6:45:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2012
RECORD_ID
PR0231309
PE
2361
FACILITY_ID
FA0003756
FACILITY_NAME
KISHIDA, GEORGE INC
STREET_NUMBER
1725
STREET_NAME
ACKERMAN
STREET_TYPE
DR
City
LODI
Zip
95240
APN
06219001
CURRENT_STATUS
01
SITE_LOCATION
1725 ACKERMAN DR
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231309_1725 ACKERMAN_2002-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order: 2237782 <br />D. Results of "l'estiagJServ3cJng ' <br />Software Version Installed: <br />Complete the following checklist: _ <br />Yes <br />❑ No* <br />Is the audiblc alarm operational? <br />Yea <br />Q Na* <br />Is the visual alarm operational? <br />to No* <br />Were ail sensors visually inspected, functionally tested, and confisined operational? <br />Yes <br />Q No' <br />Were Tat] installed at low; st point of secondary containment and positioned so that other equipment will <br />L3 Yee <br />®N�;o;�*'� <br />not interfere with their proper operation? <br />If alarms atm relayed to a remote monitoring station, is ail communications equipment (c,g- modern) <br />operational? <br />es <br />Q No* <br />For pressurized piping systems, docs the turbine automatically shut down if the piping secondary contaittrtrent <br />D N/A <br />monitoring system detects a leak, fails to Operate, or is electrically disconnected? If yes: which sensors initiate <br />positive shut -down? (Check aff that appTyj Q-5nmprfrench Sensors; U Dispenser Containment Sensors. <br />Did you confirm positive shut -dawn due to leaks and sensor failure/disconnection? El-Y-t�r, U No. <br />❑ Yes <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br />N/A <br />mechanical overfill prevention valve is installed), is the eve", warning alarm visible and audible at the tank <br />-01 point(s) and operating properlY? If so, at what percent of tank capacity does the alarm trigger? _ ,_• _% <br />O Yes' <br />o <br />Was any monitoring equipment replaced? if yes, identify specific sensors, probes, or other ctluipment replaced <br />list the manufacturer name and model for all replacement parts in Section E, below. <br />❑ Yes* <br />No <br />and <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all shot apply} <br />Q product; O Water. If yes, describe causes in Section E, below. <br />y <br />O No* <br />Was monitoring system set-up reviewed to ensure proper settings? Attach set up r orfs, if applicable <br />Yes <br />O No" <br />Is all monitoring equipment operatiunal per manufacturer's specifications? <br />* In SecRon E below, d crlbe haw Arid when these deficiencies were or will be corrected. <br />Tanknology-NDE 8900 Shoal Creek, Building 200 Austin, Texas 78757 <br />
The URL can be used to link to this page
Your browser does not support the video tag.