Laserfiche WebLink
Work Order: 2237782 <br />s _ ICOJ /4 pntenC'festhislServicing: <br />Site Address' <br />Check this box if [ank gauging is used only for inventory control. <br />. <br />Equipment' ❑ Check this box if no tank gauging OF SIR equipment is installed - <br />F. lin-Tflnk Gaugtttti P SIR <br />. This section must be completed if in -tank gat.10119 equipment is used to perform leak detection rnonitoring. <br />Co[nplete the. following checklist: testing fnr ground fauits7 <br />❑ yes ❑ No' Has all input wiring been inspected for proper entry and termination, including g <br />• there alt tank gauging probes visually inspected Cur damage and residue huildup 1 <br />E3 Yes ❑ No stem product level readings tested? <br />[3 Yes ❑ No' sues accuracy aC sy <br />❑ Yes ' R No* Was accuracy of system ureter level readings tested? <br />Cl Yes O No" Were all prones reinstalled properly? <br />G1 Yes Q No <br />• Were all items on the equipment malusfacturcr's ataiulenance clteeklist completed? <br />In the Section N, below. describe how and whet, the, <br />deticicnstes were ar will be corrected. <br />G. Line Leak Detectors <br />(LLD): 13 Check this box if t.Lth 'M not i,tstailed. <br />_ _ -• '--- _`.�dr�+• .__,. _:...,.Mrwt to verify 1d.D perfot'n'1@nCC7 <br />• Iq the Secticu 11 <br />H. Comtnents_ <br />❑ 0.1 !a•P• b ; ❑ 0.2 g.p.h. <br />a.p.h.: <br />Tanknology-NDE 8900 Shoal Creek, Building 200 Austin, Texas 78757 <br />system <br />