Laserfiche WebLink
SWRCB, January 2002 <br />5. PII'ING SUMP TESTING <br />Page Z of 'L - <br />Test Method Developed By: 0 Sump Manufacturer 2ndustry Standard ❑ Professional Engineer <br />Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum -R-gy-drostatic <br />❑ Other (Specify <br />Test Equipment Used: <br />Equipment Resolution: <br />F:. ,,,x aea' .. <br />'cox • ."` <br />Sump # <br />Sump # <br />Sump# <br />Sump # <br />Sump Diameter: <br />Sump Depth: <br />Sump Material: <br />Height from Tank Top to Top of <br />Highest Piping Penetration; <br />17, (� <br />Height from Tank Top to Lowest <br />„ <br />Electrical Penetration: <br />Condition of sump prior to testing: <br />Portion of Sump Tested' <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />product and water)?. <br />Turbine shutdown response time <br />Ism programmed for fail-safe <br />shutdowtdown? <br />-Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Was fail-safe verified to be <br />o erational?` <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA " <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />Test Start Time: <br />Initial Reading (Rj): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF -Rt): <br />Pass/Fail Threshold or Criteria: <br />Test Result: <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail" <br />❑ Pass ` ❑ Fail <br />0 Pass ❑ Fail <br />Was sensor removed for testing? <br />u Yes ❑ No ❑ NA <br />❑ Yes ❑ No [INA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testin ? <br />- yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes []No ,- NA <br />❑ Yes ❑ No ❑ NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Syrn S N Q`i- S�GPrLC-') — A)Q Tt=:!�T— <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to a� of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />