My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
351
>
2300 - Underground Storage Tank Program
>
PR0231310
>
COMPLIANCE INFO_1986-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2022 2:12:40 PM
Creation date
6/23/2020 6:46:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2003
RECORD_ID
PR0231310
PE
2361
FACILITY_ID
FA0003773
FACILITY_NAME
VAN DE POL ENT INC/PACIFIC PRIDE
STREET_NUMBER
351
Direction
N
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04903015
CURRENT_STATUS
01
SITE_LOCATION
351 N BECKMAN RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231310_351 N BECKMAN_1986-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 Page of <br />r,l= V Q 0131 ta 1 a 31 iZM 31AIKS I Q IF -A10 10 1 0 11111 <br />Test Method Developed By: <br />❑ UDC Manufacturer industry Standard <br />❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: <br />❑ Pressure <br />0 Vacuum <br />ydrostatic <br />D Other (Spec) <br />Test Equipment Used: <br />Equipment Resolution: <br />-, <br />UDC #5: <br />UDC # <br />UDC # <br />UDC # <br />UDC Manufacturer: <br />UDC Material: <br />UDC Depth: <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />, <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />testing: <br />Portion of UDC Tested <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes <br />❑ No ❑ NA <br />❑ Yes ❑ No <br />❑ NA <br />product and water)?* <br />Turbine shutdown response time <br />Is system programmed for fail- <br />safe shutdown?' <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes <br />❑ No ❑ NA <br />❑ Yes ❑ No <br />❑ NA <br />Was fail-safe verified to be <br />operational?' <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes <br />❑ No ❑ NA <br />❑ Yes ❑ No <br />❑ NA <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />Test Start Time: <br />Initial Reading ): <br />Test End Time: <br />Final Reading RF): <br />Test Duration: <br />Change in Reading F -RI): <br />Pass/Fail Threshold or Criteria: <br />Test Result: <br />❑ ' Pass © Fail <br />U Pass 0 Fail <br />' : ❑ Pass ` ❑ Fail <br />❑` Pass ❑`Fail <br />Was sensor removed for testing? <br />❑Yes ❑ No ❑ NAJDYes <br />❑Yes ❑ No 0 NA <br />❑Yes <br />❑ No ❑ NA <br />❑Yes ❑ No <br />❑ NA <br />Wa.s sensor properly replaced and <br />verified functional after testin ? <br />❑ Yes ❑ No ❑ NA <br />❑ No ❑ NA <br />❑ Yes <br />❑ No ❑ NA <br />❑ Yes ❑ No <br />❑ NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />r/0 ff04 y -- A-\6 `ice` <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to gny of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.