My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
351
>
2300 - Underground Storage Tank Program
>
PR0231310
>
COMPLIANCE INFO_2010-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2022 2:52:45 PM
Creation date
6/23/2020 6:46:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2011
RECORD_ID
PR0231310
PE
2361
FACILITY_ID
FA0003773
FACILITY_NAME
VAN DE POL ENT INC/PACIFIC PRIDE
STREET_NUMBER
351
Direction
N
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04903015
CURRENT_STATUS
01
SITE_LOCATION
351 N BECKMAN RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231310_351 N BECKMAN_2010-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�RTILL <br /> G <br /> 2793 PADDY CREEK LANE ODI. CA 95240 <br /> PH. (209)368-9381 FAX (209)367-1163 <br /> January 27, 2'NECEIVED <br /> Jim Thorpe Oil <br /> 351 N. Beckman Rd. JAN 31 2011 <br /> Lodi, Ca 95240 <br /> ENVIRONMENTAL HEALTH <br /> Subject: Report of Inspection for Lining of Underground Diesel Storage Tank PERMIT/SERVICES <br /> Date of Inspections: 1/11, 12, 13/2011 <br /> Site of Inspection: Same as above <br /> Tank Description: 10,000 Gallon Double Wall Underground Steel Tanks <br /> Tank Number: #16 <br /> Attention: Marty Thorpe <br /> Dear Mr. Thorpe, <br /> As per your request for Engineering Services to inspect and certify two 10,000 gallon underground <br /> diesel tanks for epoxy lining, this author has prepared the following report of the lining procedure <br /> and inspection. <br /> PROCEDURE FOR LINING <br /> SAFETY <br /> Cleaning and lining oft s requires that both lining and inspection personnel enter the confined <br /> spaces of the tanks. The tanks must be fully forced air ventilated before any personnel are allowed <br /> in the tanks.Personnel must be fitted with a safety harness and a retrieval system installed above the <br /> opening. All personnel entering the tanks must wear standard safety gear along with special safety <br /> gear for confined space work. The crew and this author were equipped with all required safety gear <br /> before entering the tanks. <br /> CLEANING and PREPARATION for LINING <br /> The tanks were emptied of all product and rinsed with a hot water and detergent wash. All sludge <br /> and rinse water were handled as contaminated wash water and placed in labeled containers. <br /> Following cleaning,both tanks were sandblasted to white metal.This author inspected the inside of <br /> these tanks after they had been cleaned and sandblasted. Two very small holes of less than 1/32" <br /> were found in the bottom of tank#16. Tank#17 was found to be in very good condition and free of <br /> any leaks.This author inspected both tanks and found them to be structurally sound and suitable for <br /> lining after the Tank#16 was patched. <br /> LEAK PATCHING <br />
The URL can be used to link to this page
Your browser does not support the video tag.